Laserfiche WebLink
i • <br /> J Bonfill 8 Associates <br /> RFQ#12-04-02 Page 33 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects, if not specified. 09 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2010 <br /> Miami-Dade College Wolfson Campus 300 NE 2n0 Avenue Miami, FL 33132 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Land Surveying N/A <br /> 23. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Miami-Dade College Gloria Isabel Garzon (305)237-0561 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,andcosL <br /> Description: For four parcels at Miami-Dade College Wolfson Campus Classrooms/Student Union Building. Limits of Survey Work: The <br /> full roadw y rights-of-way of NE 2nd Avenue and NE 3rdStreet abutting the four properties, including the radius of return at NE 4ei Street <br /> and NE 2 Avenue,and the full intersection of NE 3f0 Street and NE 2nd Avenue up to the furthest radius of return. Twenty five(25)feet <br /> outside the abutting rights-of-way. A portion of existing Mc Donald's Building to the north of the subject parcels. Up to the western Metro <br /> Mover columns, including the western edge of the overhead Metro Mover track. <br /> Scope of Work: Outside the roadways: Boundary and topographic survey in State Plane coordinates. Located all visible above-ground <br /> improvements, including pavement and types of ground cover,driveways,walkways, curbs, mailboxes,fences,trees,signs, buildings, <br /> structures,lighting,drainage, utilities,overhead power lines. Located all easements within or abutting the property. Located all legal <br /> 1 property boundaries and property corners referenced to property/plat maps. Existing grade elevations based on NGVD along all property <br /> corners and boundaries at 50'max intervals, at located improvements and significant grade'breaks. Located the closest Metro Mover <br /> columns to the property and the west edge of the overhead Metro Mover structure. • <br /> Abutting rights-of-ways: Topographic route survey in State Plane coordinates. Set centerline controls and survey tie to Section Corner <br /> Set West to East and South to North baselines. Set elevation control along the route(TBM). Located all visible above-ground <br /> improvements, including pavement and types of ground cover,driveways;walkways,curbs, mailboxes,fences,trees,signs, buildings, <br /> structures,lighting,drainage, utilities, overhead power lines. Roadway cross-sections at 50'stations and significant grade breaks(high and <br /> low points)with elevations at: R/W lines and centerlines,crown of road,edge of pavement,top of curb,front and back of sidewalk. <br /> Utilities(on and off site): Topographic survey and underground utility location by Ground Penetration Radar(GPR)for underground utility <br /> location of conductive and non-conductive materials;flagging of water lines,sewer lines, electric lines and communication lines. Located all <br /> visible above ground utilities, including drainage catch basins,valve boxes, hydrants,manholes, structures, poles,overhead lines. <br /> Indicated type of utilities(sanitary, storm,water,gas, telephone,etc.)and corresponding companies. Designated the horizontal locations of <br /> all existing drainage and underground utility lines,ductbanks, etc., including type,alignment,size, material and whether active or inactive. <br /> Utilized Ground Penetrating Radar(GPR)and Radio Electro-Magnetic Frequency(RF). Elevations for all underground structures(inlets <br /> and manholes)including rim elevations,invert elevations and directions,size and material of connecting pipes,bottom of structure <br /> elevations. Located existing utilities on-site and off-site. <br /> Fees paid to firm: 514,052 Project Start Date: 10/2009 Completion Date: 05/2010 <br /> e Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A <br /> Client Information: Miami-Dade College Wolfson Campus 300 NE 2nd Avenue Miami, Fl 33132 <br /> Gloria Isabel Garzon Telephone: (305)237-0561 Fax: (305)237-2590 Email: garzon@rndc.edu <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. <br /> (1)FIRM NAME . (2)FIRM LOCATION(City and State) (3)ROLE <br /> c. <br /> 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> • <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> e. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> I f, <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE <br /> MANDATORY USE DATE OF FORM 6/2004 <br /> 1 <br />