|
i •
<br /> J Bonfill 8 Associates
<br /> RFQ#12-04-02 Page 33
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY
<br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER
<br /> (Present as many projects as requested by the agency,or 10 projects, if not specified. 09
<br /> Complete one Section F for each project.)
<br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2010
<br /> Miami-Dade College Wolfson Campus 300 NE 2n0 Avenue Miami, FL 33132 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Land Surveying N/A
<br /> 23. PROJECT OWNER'S INFORMATION
<br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
<br /> Miami-Dade College Gloria Isabel Garzon (305)237-0561
<br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,andcosL
<br /> Description: For four parcels at Miami-Dade College Wolfson Campus Classrooms/Student Union Building. Limits of Survey Work: The
<br /> full roadw y rights-of-way of NE 2nd Avenue and NE 3rdStreet abutting the four properties, including the radius of return at NE 4ei Street
<br /> and NE 2 Avenue,and the full intersection of NE 3f0 Street and NE 2nd Avenue up to the furthest radius of return. Twenty five(25)feet
<br /> outside the abutting rights-of-way. A portion of existing Mc Donald's Building to the north of the subject parcels. Up to the western Metro
<br /> Mover columns, including the western edge of the overhead Metro Mover track.
<br /> Scope of Work: Outside the roadways: Boundary and topographic survey in State Plane coordinates. Located all visible above-ground
<br /> improvements, including pavement and types of ground cover,driveways,walkways, curbs, mailboxes,fences,trees,signs, buildings,
<br /> structures,lighting,drainage, utilities,overhead power lines. Located all easements within or abutting the property. Located all legal
<br /> 1 property boundaries and property corners referenced to property/plat maps. Existing grade elevations based on NGVD along all property
<br /> corners and boundaries at 50'max intervals, at located improvements and significant grade'breaks. Located the closest Metro Mover
<br /> columns to the property and the west edge of the overhead Metro Mover structure. •
<br /> Abutting rights-of-ways: Topographic route survey in State Plane coordinates. Set centerline controls and survey tie to Section Corner
<br /> Set West to East and South to North baselines. Set elevation control along the route(TBM). Located all visible above-ground
<br /> improvements, including pavement and types of ground cover,driveways;walkways,curbs, mailboxes,fences,trees,signs, buildings,
<br /> structures,lighting,drainage, utilities, overhead power lines. Roadway cross-sections at 50'stations and significant grade breaks(high and
<br /> low points)with elevations at: R/W lines and centerlines,crown of road,edge of pavement,top of curb,front and back of sidewalk.
<br /> Utilities(on and off site): Topographic survey and underground utility location by Ground Penetration Radar(GPR)for underground utility
<br /> location of conductive and non-conductive materials;flagging of water lines,sewer lines, electric lines and communication lines. Located all
<br /> visible above ground utilities, including drainage catch basins,valve boxes, hydrants,manholes, structures, poles,overhead lines.
<br /> Indicated type of utilities(sanitary, storm,water,gas, telephone,etc.)and corresponding companies. Designated the horizontal locations of
<br /> all existing drainage and underground utility lines,ductbanks, etc., including type,alignment,size, material and whether active or inactive.
<br /> Utilized Ground Penetrating Radar(GPR)and Radio Electro-Magnetic Frequency(RF). Elevations for all underground structures(inlets
<br /> and manholes)including rim elevations,invert elevations and directions,size and material of connecting pipes,bottom of structure
<br /> elevations. Located existing utilities on-site and off-site.
<br /> Fees paid to firm: 514,052 Project Start Date: 10/2009 Completion Date: 05/2010
<br /> e Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A
<br /> Client Information: Miami-Dade College Wolfson Campus 300 NE 2nd Avenue Miami, Fl 33132
<br /> Gloria Isabel Garzon Telephone: (305)237-0561 Fax: (305)237-2590 Email: garzon@rndc.edu
<br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> a.
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> b.
<br /> (1)FIRM NAME . (2)FIRM LOCATION(City and State) (3)ROLE
<br /> c.
<br /> 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> d.
<br /> •
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> e.
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> I f,
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE
<br /> MANDATORY USE DATE OF FORM 6/2004
<br /> 1
<br />
|