Laserfiche WebLink
II J Bonfill&Associates <br /> RFO#12-04-02 Page 52 <br /> 1F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present es many projects as requested by the agency, or 10 projects, if not specified. <br /> Complete one Section F for each project.! <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Overtown Transit Village, Miami, PROFESSIONAL SERVICES CONSTRUCTION Of applicable) <br /> Florida 2009 2009 <br /> 23. PROJECT OWNER'S INFORMATION <br /> I a.PROJECT OWNER E.POINT OF CONTACT NAMEc.POINT OF CONTACT TELEPHONE NUMBER <br /> Miami-Dade Cty. Transit Agency Elizabeth Piotrowski (954) 524-8686 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> 1 Structural Engineer of Record for this 22-story High-Rise Office Building at Downtown <br /> Miami, including 8 levels of Parking Garage. <br /> Project Construction Cost = $60,000,000. <br /> II <br /> I • <br /> 1 <br /> II • <br /> II25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (11 FIRM NAME (2)FIRM LOCATION(City and State) (31 ROLE <br /> I a. Nifah and Partners Miami, Florida Structural Engineer of Record <br /> Consulting Engineers, Inc Threshold Inspector <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) 131 ROLE <br /> b. <br /> I11)FIRM NAME '(2)ARM LOCATION(City end State) • (31 ROLE <br /> C. <br /> i11)ARM NAME (2)FIRM LOCATION!City end State) (3)ROLE <br /> d. <br /> 111 FIRM NAME 12)FIRM LOCATION(City and State) (31 ROLE <br /> e. <br /> • <br /> 11)FIRM NAME 12)ARM LOCATION(City and State) 13)ROLE <br /> I f. <br /> STANDARD FORM 330 16t2004) PAGE 3 <br /> I <br /> I <br />