Laserfiche WebLink
I <br /> I J Bonfill&Associates <br /> RFC#12-04-02 Page 54 <br /> IG. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F <br /> PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing <br /> I (From Section E, (From Section E, table. Place "X" under project key number for <br /> Block 12) Block 13) participation in same or similar role.) <br /> 1 2 3 4 5 ' 6 7 8 9 I 10 <br /> Samuel N. Nifah, P.E. Principal-in-Charge/ <br /> Project Manager K X K X X K XX X <br /> I Ronald Duran, P.E. Senior Structural/ <br /> Civil Engineer K X X X X X XX X <br /> David Santamaria, EI Senior Structural <br /> 1Engineer X X X K X X XX X <br /> Erlan Palenzuela, EI Senior Struct. Eng. <br /> X X X X X X XXX <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I29. EXAMPLE PROJECTS KEY ' <br /> 1 NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) <br /> Overtown Transit Village for <br /> Miami-Dade county Transit Agency 6 A-B Infill Shell at Miami International <br /> 1 Airport <br /> 2 Hotel de 1' Opera/Mikado 7 American Airlines B-C Infill Shell Miami <br /> Int'l Airport, Miami, Florida <br /> I 3 Off Brickell 8 Joseph Caleb Center Courthouse Project <br /> Miami, Florida <br /> 4 Prima Luce 9 New Northside Runway at Miami <br /> I <br /> International Airport <br /> 5 South Miami Heights Maintenance 10 Security Operations Control Center at <br /> Miami International Airport <br /> STANDARD FORM 330 1612004)PAGE 4 <br /> I <br /> I <br />