My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J. Bonfill
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
J. Bonfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 4:00:38 PM
Creation date
2/5/2016 4:00:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J Bonfill&Associates <br /> RFQ#12-04-02 Page72 <br /> Samuel N.Nifah,Y.E. <br /> Page 2 of 3 <br /> Employment(Cont.) <br /> Structural Engineer <br /> . Cantor Seinuk Paig drArsoaiater 01/90-10/90 <br /> Miami,Florida <br /> Was responsible for design and coordination of high-rise buildings, <br /> computer applications using structural programs such as ETABS, <br /> ADOSS,SAP90,etc. Design handbooks in accordance with design <br /> ' methods of ACI 318.Threshold inspections.Project Engineer of <br /> multi-million luxury condominiums at Fisher Island, Florida. <br /> Structural Engineer/Civil Engineer <br /> Gomez-Pina Engineering 02/88- 12/89 <br /> Miami,Florida <br /> Design of low and mid-rise residential and commercial buildings and <br /> shopping centers. Design of reinforced concrete structures,steel, <br /> reinforced masonry block walls and foundations. Miscellaneous civil <br /> ' engineering works,site survey, and inspections <br /> Representative List of Projects <br /> Port of Miami Tunnel Project <br /> Review of Plans and Specifications for the Construction Trailers. <br /> Seaport Bond Engineers—Port of Miami <br /> Nifah& Partners was a subconsultant under this Contract at the Port <br /> of Miami. <br /> • <br /> Port of Miami Capital Improvement <br /> Assignments included Port of Miami Containers management and tie <br /> downs to comply with applicable codes. <br /> Parking Garge #4—Port of Miami <br /> Value analysis and Life-cycle costing of the structural and civil design <br /> t of this project <br /> MIA Mover APM System <br /> CIS Oversight with B&A at Miami International Airport <br /> New Northside Runway 8-26 at MIA: Civil and Structural <br /> . Engineering Services <br /> MIA Midfield Airport Rescue and Fire Fighting Facility: A/E of <br /> Record. Provided Structural and Civil Engineering Services,overall <br /> project management,threshold/special inspections and coordination. <br /> 1 <br /> Structural • Civil • Threshold Inspections <br /> I <br /> 8785 S.W. 16.5 Avenue,Suite 106,Miami,Florida 33193 7305.386.1002 F 305.386.3907 www.nifahportners.com <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.