Laserfiche WebLink
IJ Bonfill 8 Associates <br /> N 1 FAH RFQ#12-04-02 Page 76 <br /> 1 <br /> r - & PARTNERS <br /> CONSULTING ENGINEERS. INC. <br /> I f , ^ 1, Ronald Duran P.E. <br /> -T Senio,Structura/&CM/Engineer <br /> 1 r = li �, ` Overview <br /> -`'". : Mr. Duran has over 35 years of experience in the design of many different types <br /> e ', r./ , of structures for Metro-Rail projects, bridges, civil structures, buildings and <br /> I t"Mf temporary structures for construction equipment, forming and others. <br /> , c <br /> t. Employment <br /> Nifah and Partners Consulting Engineers, Inc. -Miami, FL March 2010-Present <br /> I Areas of Expertise The Raul Puig Group, PA. -Miami, Florida 2004-2010 <br /> • Structural Engineering Kan Mehta&Associates, Inc., Pompano Beach, FL 1997-2004 <br /> The Raul PuigGroup, PA. -Miami, Florida 1994- 1997 <br /> • Civil Engineering Services for Companies in USA, Bolivia& Mexico 1974- 1994 • <br /> I Years of Experience Special Consulting Services <br /> Structural Plan Examiner for Dade County Building Dept. 1994- 1995 <br /> With Other Firms: 36 Years Plant Inspector of Wood Truss Mfg. in So. Fla. for Truss Plate Institute. 1994-95 <br /> IEducation Representative Projects <br /> » UNIVERSIDAD MAYOR DE 1. Metrorail and Transit Projects <br /> SAN ANDRES in La Paz, • Tren Urbano Project-San Juan, Puerto Rico: Project Management <br /> I Bolivia, with Major on Oversight (PMO) for Fed.Transit Admin. control of 2-billion construction proj. <br /> structural engineering and Remedial work design assistance was performed also. <br /> Minor on Civil/Sanitary • Metro Rail Extension: Miami-Dade Transit. Analysis and preparation of <br /> engineering. 1969- 1974 remedial works to correct camber-generated problem. St'l box girders. <br /> I .I <br /> POLITECNICO DI MILANO, • Miami Downtown Station Preliminary Studies: New Mall under Metrorail <br /> Italy, Master on Reinforced combined with bus station, a Miami-Dade Transit project. <br /> Cont. Bridge & Bldg. Struct. • "The Lofts" building over the Miami Metrorail: Metrorail protection structure <br /> 1978-79 against accidental fall or throw of materials or objects from the building. <br /> I + COMPUTING SELF- • Meirorail 22 Stations- Stair railings Repairs: Miami-Dade Transit Dept. for <br /> EDUCATIONin USA, Italy • <br /> retrofitting of railings update to Code. <br /> , , <br /> • Dadeland Extension Corridor Roof Struct.: for Dadeland Station, Miami, FL. <br /> Mexico and Bolivia. • Bus Stop Conceptual Design: 3 conceptual struct. designs presented. Miami <br /> Programming&operation of <br /> I several operating systems, 2. Bridge Engineering (VECP= "Value Engineering Change Proposal") <br /> development of eng. design • Railroad Bridge over New River for Tri-Rail Project: Prelim. analysis and <br /> programs, operation of cost comparison, plus VECP studies on proposed foundation. Tri-County, FL <br /> I software for bridge and <br /> building struct., foundations, <br /> • M.I.A. Upper Vehicular Drive and foundation: 50-span comp. steel,including <br /> future People Mover columns; roadway, geometry, auger piles. Miami, FL <br /> post-tensioned concrete, • Pedestrian Bridge for Miami-Dade Transit: US-1 and Douglas Road. Fla. <br /> etc. Skilled in AutoCAD, • VECP design for Southern Blvd. bridges over Stub Canal/SFRC and 1-95: <br /> I construction accounting • <br /> programs, MS Office, etc. • Re-designed bridges using prestressed cont girders instead of steel.W.P.B. <br /> • Bridge on 97th Ave. over SR836 Foundation Re-design: VECP service.The <br /> original pile foundation was redesigned for continuous mat foundation at piers. <br /> Registrations • Bridge on 97th Ave. over SR836 Value Engineering: Presentation proposed <br /> I . Registered Professional to Miami-Dade County Public Works Dept. with savings of up to$4 Million. <br /> Engineer: FL PEf136075 • VECP design for Southern Blvd/Australian Ave., Bridge `C1'(5 spans) <br /> and ramp 'D' (3 spans): Prestressed conc. Beams, FDOT-IV Proj. Palm Bch. <br /> • Gen. Contractor(Inactive) • <br /> VECP design for Okeechobee Bridge/I-95: 3-Span. FDOT-IV. Palm Bch., FL <br /> I • Continuing Education <br /> Provider No. 004840 • Bascule steel bridge structural analysis and repair design: For the Jewfish <br /> Creek at the Intracoastal Waterway, FDOT -VI project. Monroe County, FL <br /> • Bascule Bridge Inspection: works for Rehabilitation design on Jewfish <br /> Languages Creek, Structural steel, FDOT District VI project. Monroe County, Florida. <br /> I • Read and write: English/ • Bascule steel bridge: US-1/C-111 canal,joint repair design. Miami-Dade, FL. <br /> Spanish/Italian • Regency Bypass: Conc. bridge designs. Curved, 3 spans, Jacksonville, FL. <br /> • Read: Portuguese • Prestressed brdg. beams failure after accident: Remedial work M.I.A. FL. <br /> IPage I of 2 <br /> I <br />