Laserfiche WebLink
I J Boffin 8 Associates <br /> RFQ#12-04-02 Page 102 <br /> I <br /> BONFILL & ASSOCIATES <br /> A r c h i t e c i s <br /> Land Surveyors & Mappers <br /> I A.4s -IL <br /> Pi Approach and Methodology <br /> I Drainage Survey: Locate underground (XYZ, pipe size, type, condition, flow line) that relate to <br /> above ground data. Field edits, analysis and processing of all field collected data, maps, reports. <br /> I Underground Utilities: Designation includes 2-dimensional collection of existing utilities and <br /> selected 3-dimensional verification as needed for designation. Location includes non-destructive <br /> excavation to determine size, type and location of existing utility, as necessary for final 3- <br /> - dimensional verification. Survey includes collection of data on points as needed for designates and <br /> Ilocates. Includes analysis and processing of all field collected data, delivery of all electronic files. <br /> Water Boundary Survey: Perform Mean High Water, Ordinary High Water and State Upland Line <br /> ISurveys as required by City Standards. <br /> Photogrammetric: Photogrammetric control, including the determination of photo identifiable <br /> control points and marking contact prints. - <br /> I <br /> Submittals and Deliverables: JBA will submit to the City signed and sealed maps of all surveys <br /> performed as required by the scope of work, as well as all field books data if required. <br /> IProgress Reports: Submit regular reports of the work at intervals appropriate to the Project. <br /> I Field Notes: JBA will Submit to the Project Manager one original set of all field survey notes and <br /> any other data developed for the purpose of performing the required surveying Work required for <br /> the Project. Field Notes will be presented in a field book acceptable to the City. When using data <br /> collectors, a report and digital submission will be provided along with all the necessary field survey <br /> Iinformation. The report will be furnished in a field data archive form acceptable to the City. <br /> Drawings: JBA will perform CADD drafting services required to supplement the field work. Plan <br /> I and profile, cross-section sheets shall be in printed and digital form. JBA will submit to the City <br /> electronic files all of the information gathered to produce said maps of the survey including but not <br /> limited to Electronic files for: <br /> • Existing topography ▪ Existing utilities <br /> • <br /> Existing drainage features • Existing elevation points <br /> • Reference points • Horizontal Project Network Control <br /> • GPS Project Network Contro l• Vertical Project Network Control <br /> I • Existing right of way and monument lines <br /> Topography: <br /> I • Locate and identify all above ground structures from RPM to R/W, including but not limited to <br /> buildings, overhangs, columns, planters, pavement, driveways including type, sidewalks, <br /> walkways, concrete/asphalt slabs, mailboxes, fences, bus stop shelters and signs, trees <br /> I including trunk diameter, shrubs, landscaped areas, street signs, fire hydrants. Identify all <br /> surfaces such as sod or the type of pavement. <br /> I I I <br /> 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 <br /> AAC002050 • LB3398 • www.jbonfill.com <br />