Laserfiche WebLink
® Tony Shahnami, P.E., CxA <br /> ® Principal in Charge—Mechanical Engineer <br /> ® V Mr. Shahnami is a registered Professional Engineer with 30 years of experience in <br /> ® the mechanical, electrical, IAO, and plumbing fields. His registration in several <br /> f;fii states makes him particularly well qualified to perform design-engineering tasks <br /> ® across the nation for a wide range of clients. Also, he has specialized experience <br /> managing continuing services contracts with both public and private clients. <br /> ® ,: Alt tt- <br /> Mr. Shahnami areas of expertise are heat transfer, fluids, indoor air quality, steam <br /> 0 ,._ 74� systems, heat recovery and geothermal systems. He has utilized this expertise <br /> ® - , - such that SGM Engineering is recognized as one of the leading firms in the State of <br /> • Florida with respect to high performance, energy efficient designs for local and <br /> ® federal government facilities. This is evident thru the award of the first two LEED <br /> sustainable schools in Central Florida. Mr. Shahnami s project experience has <br /> 0 ,J� been predominantly in the local and federal government markets which includes but <br /> ® not limited to the United States Navy, Army Corps of Engineers, City of Orlando, <br /> . and the United States Air Force. He is registered in over 38 states which has led <br /> ® sa. ‘-: r4 him to a broad knowledge of building codes across the country. <br /> YEARSLEXPERIENCE 30 <br /> ® .Wdhrs_GM-r ince 1991`- ' J Mr. Shahnami is the president of the firm and has the authority to represent the firm <br /> ri in all contractual matters. Mr. Shahnami has received a Certificate of Recognition <br /> ® EDUCATION z- by the Orange County Chairman for outstanding design of make-up water retrofit at <br /> ® Bachelor of -- the Convention Center's Central Utility Plant. The design incorporated the use of <br /> Engineering reclaimed water as make-up water for the existing Cooling Towers (2,200 Tons <br /> ® jUr'niversity1Miami, 1978 Cooling). The Cooling Towers now are using Reclaimed Water for HVAC purposes. <br /> ® The new design has saved Orange County Convention Center over $100,000 per <br /> year in drinking water. <br /> ® REGISTRATION <br /> 1989=Registered Professional <br /> ® Engineer=Flonda�41204 As an ACG Certified Commissioning Agent, Mr. Shahnami has managed LEED- <br /> certification and design; provided commissioning and advanced commissioning; <br /> has experience with controllable systems (lighting, thermal comfort), water <br /> Also Registered Professional efficiency, energyefficiency, and indoor environmental <br /> e Engineer-Al... .,Arkansas, quality; experience with <br /> ® Arizona, California, Colorado, materials selection including recycled materials and content and low-emitting <br /> Georgia, Illinois, Indiana, Iowa, materials selection; and experience with materials reuse. <br /> ® Kansas,glanS Louisiana, <br /> ® Maine, Maryland, Massachusetts, Project Experience <br /> Michigan, Minnesota, Mississippi, 2012, Flagler County Courthouse Annex Sherriff's Department Renovations <br /> ® Missouri, Nebraska, * and Energy Efficient Upgrades, Bunnell, FL — As Principal in Charge, Mr. <br /> New Mexico,Itim tti23,North <br /> Oklaho <br /> • Carolina, Ohioma, Shahnami is overseeing the renovations to accommodate the needs of the sheriff's <br /> , Oklahoma, <br /> • Pennsylvania, South Carolina, operations. Renovations include the following: Add fire sprinkler system, <br /> Tennessee, . replacement of the main fire alarm panel, repair exterior windows, confirm fire rated <br /> separation between Historic Courthouse and Annex, replace NC ductwork, VAV <br /> ® Virginia,Washington, units and controls, provide a ducted return system, test and balance the new <br /> • <br /> Virginia,Wisconsin EMI Wyoming. system, replace all lighting with energy efficient fixtures and lighting controls, <br /> ® replace electrical power distribution system, new communications data and <br /> technologies equipment, renovate all restrooms to ADA standards, replace all <br /> ® suspended acoustical ceilings and grid with new efficient acoustic values, replace <br /> all water heaters with energy efficient units. <br /> ® 2010 Orange County Fire & Rescue, Fire Station #35, Orlando, FL —SGM <br /> ® developed the owners OPR documents, reviewed drawings during construction, <br /> ® developed the commissioning plan, attended construction meetings, witnessed <br /> equipment start up, performed functional performance tests on the equipment and <br /> ® provided Test & Balance services. Commissioning procedures were performed <br /> following the ACG guidelines and the requirements of LEED. <br /> ® 2010, Orlando Science Center HVAC, Lighting, Power, Plumbing & Fire <br /> ® S GM AProtection Energy Assessment, Orlando, FL — Mr. Shahnami oversaw the <br /> 0 engineering services to identify and recommend the best and most economical and <br /> ,_ energy efficient method of correcting the HVAC equipment located at the Orlando <br /> G E NG I N E E RI NG? Science Center Complex. Responsibilities included: operation and the deficiencies <br /> MEP CONSULTING ENGINEERS associated with the operation. Inspect the facilities in areas of HVAC, lighting, <br /> • power, Fire Alarm, security system, Plumbing & FP system. <br /> O 30 <br />