0
<br /> 0 Victor Goykhman
<br /> ® Executive Vice President/ Electrical
<br /> •
<br /> ® Mr. Goykhman is Vice President of SGM Engineering with 38 years of Electrical
<br /> _- Engineering experience, including 22 years in the consulting field. Mr. Goykhman's
<br /> ® responsibilities include QA/QC portion of electrical design and project management.
<br /> Mr. Goykhman reviews all design documents before being issued to the contractor
<br /> ® = � for permitting and pricing. Mr. Goykhman has extensive experience with electrical
<br /> ® renovations, alterations and additions for existing higher education facilities.
<br /> ® Mr. Goykhman has a very sound working knowledge of Electrical Systems including
<br /> _ educational, health care, communications, video, computer networking, fire smoke
<br /> ® ! detection and alarm, emergency power and many other systems critical to large,
<br /> ® SRmodern facilities. Mr. Goykhman's extensive experience allows him to be an
<br /> excellent designer of power and lighting networks for all types of facilities. Mr.
<br /> ® = - 1 Goykhman has been managing design teams at SGM for over twenty years. These
<br /> design teams have worked on projects for all types of facilities, including university
<br /> ® ,. - _- campuses, institutional, educational and other types of commercial facilities. His
<br /> YE'ARS:E XPE 871E NCE 38 experience allows him to establish the goals for a project and the necessary means
<br /> WithSGMrsmce 199 . to accomplish cost effective, innovative solutions. Mr. Goykhman has been heavily
<br /> ® ', "gym ;" involved in scheduling and cost analysis of all types of projects. Mr. Goykhman's
<br /> ® EDUCATION practical experience results from working closely with contractors and from
<br /> fr ffv1 Engineering reviewing scheduling and cost information enabling SGM Engineering to provide
<br /> ® Degree accurate timely data to our clients.
<br /> Polytechnic
<br /> ® Uzbekistan, Project Experience
<br /> TIN
<br /> Ongoing, Town of Palm Beach Street, Street Lighting, Town of Palm Beach,
<br /> ® FL— Mr. Goykhman is an Electrical Engineer for this project. SGM was responsible
<br /> ® for the replacement and relocation of 46 street light that currently serve Dunbar Rd.
<br /> to Sunrise Ave. SGM coordinated with their facilities maintenance staff to
<br /> ® understand their needs, standards, determine a realistic schedule for the
<br /> ® design/engineering effort, meeting notes, probable construction cost estimate and
<br /> finally obtained technical cut sheets of equipment desired such that aesthetic
<br /> • uniformity was achieved in the type of light pole/fixture installed. SGM engineers
<br /> ® visited the various project locations to obtain existing data related to pole locations
<br /> and sidewalk conditions. This effort will also constitute SGM to provide full
<br /> ® Construction Administration services for the one and one-half months construction
<br /> (1.5 months) schedule desired by the Town of Palm Beach. Upon completion of the
<br /> ® construction, SGM is responsible for implementing the As-Built drawings and
<br /> delivering the record set to the Town as a CD and a hard copy 11x17 set of
<br /> ® documents.
<br /> ® On-Going, Flagler County Courthouse Annex Sherriff's Department
<br /> e Renovations and Energy Efficient Upgrades, Bunnell, FL — Mr. Goykhman is
<br /> providing electrical design services the renovations to accommodate the needs of
<br /> • the sheriffs operations. Renovations include the following: Add fire sprinkler
<br /> system, replacement of the main fire alarm panel, repair exterior windows, confirm
<br /> A fire rated separation between Historic Courthouse and Annex, replace NC
<br /> ® ductwork, VAV units and controls, provide a ducted return system, test and balance
<br /> the new system, replace all lighting with energy efficient fixtures and lighting
<br /> ® controls, replace electrical power distribution system, new communications data
<br /> ® and technologies equipment, renovate all restrooms to ADA standards, replace all
<br /> suspended acoustical ceilings and grid with new efficient acoustic values, replace
<br /> • all water heaters with energy efficient units.
<br /> • 2010, City of Orlando Events Center Parking Garage, Orlando, FL — Mr.
<br /> ®
<br /> S Goykhman provided electrical design services for this $34 million parking structure
<br /> ,`JT V which serves the needs of the Orlando Events Center. Nestor provided systems
<br /> ING? designs for the garage's CCTV high resolution video camera surveillance system
<br /> ® ENGINEER
<br /> on all levels at strategic points of access. The design also included access control
<br /> ® MEP CONSULTING ENGINEERS through the use of proximity card scanners at selected door locations. Fire alarm,
<br /> area of rescue, emergency phone system, ticket dispensers, toll gates, and
<br /> ®
<br /> communication systems were also include as part of the systems design. The
<br /> ® systems design incorporated local and remote monitoring of all systems.
<br /> •
<br /> O 34
<br />
|