My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SGM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SGM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 4:43:40 PM
Creation date
2/5/2016 4:37:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> ® . ,VNN♦isle; <br /> SGM Engineering, Inc. <br /> • City of Sunny Isles Beach RFP No. 12-04-02 <br /> • `;, Continuing Professional Architectural & Engineering Services <br /> ® Ar•\ �;:' Firms Only (CCNA) <br /> • Or 1s is ,.•' Section 4 - Approach and Methodology <br /> B Project managers receive daily email notices when RFI's are late. Each SGM team member is responsible for the <br /> ® quality of the work performed and for meeting the milestone dates created in the project schedule. Work production <br /> is supervised by each of the above project managers for each discipline (Electrical, Mechanical, and Plumbing Fire <br /> Protection) and by SGM's in house QA/QC team. SGM Contact Representative, Tony Shahnami, will be <br /> responsible for allocating personnel. Mr. Shahnami will be in charge of closely monitoring the progression of the <br /> • project with the City of Sunny Isles Beach to ensure SGM meets the contractual terms from the City. <br /> • Mr. Shahnami will be the single point of contact for the staff for the City of Sunny Isles Beach. Mr. Shahnami will <br /> • assign SGM resources for the design phase as well as establishing and maintain quality control. SGM Quality <br /> ® Assurance Managers will review the design criteria issues. SGM Quality Assurance Manager ensures the delivery <br /> of work meets current code requirements, energy efficiency requirements, feasibility, constructability and <br /> ® conformance with architectural, engineering and environmental standards and procedures. <br /> • Maximize cost savings while designing and constructing all projects with on-time performance on <br /> ® a schedule that meets all of your expectations <br /> • By using our in-house professional cost estimators, SGM will ensure an accurate cost estimate is provided with <br /> ® each design submission <br /> ® • Utilize Means cost estimating data <br /> • Receive actual cost information from manufacturers representatives or local distribution <br /> ® • Use unit pricing information from years of practical experience <br /> B • Utilize the internet for material pricing information <br /> • Stay informed of local workloads to determine competitiveness expected for the project <br /> ® • Evaluate the commodity market increases or decreases to determine pricing influences <br /> • Review these cost estimates at each phase to determine if design is tracking to budget <br /> ® • Find creative ways to maximize the scope that can be achieved for the allowed budget <br /> • <br /> • <br /> 0 <br /> 0 <br /> 0• <br /> 0 <br /> 0 <br /> a <br /> 0 <br /> • SGMA <br /> ® ENGIyNEERINGs <br /> MIP55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.