Laserfiche WebLink
• <br /> •• sown,% �. SGM Engineering, Inc. <br /> '_ City of Sunny Isles Beach RFP No. 12-04-02 <br /> • �� i• Continuing Professional Architectural & Engineering Services <br /> • `- Firms Only (CCNA) <br /> • 'YO Section 2 - Qualifications <br /> .!„�O�WY <br /> • For individual projects, we can develop and maintain a Critical Path Method project schedule utilizing Microsoft <br /> ® Project or other graphical programs. More than merely a tool to manage progress to contract completion dates, we <br /> will establish a master project schedule that encompasses all design development, and construction document <br /> • preparation. This master schedule serves to establish a work plan for accomplishing period and systematic reviews <br /> • as design progresses and to ensure significant quality control requirements are accommodated. <br /> • As design development reaches completion, quality control activities identified through the integrated design review <br /> process are then entered into the schedule where they become identifiable as discreet required activities. <br /> • <br /> ® A detailed delivery plan (Work Plan)will comprise: <br /> • Fee expenditure cash flow <br /> • • Project resource plan <br /> • Work schedule identify key dates and objectives <br /> ® • Documentation for each stage <br /> • • Signoffs required & milestone dates for approvals by the City of Sunny Isles Beach <br /> • Schedule of information required <br /> • • Statutory agency reviews and submissions <br /> • • Meeting schedule(s) <br /> • Developing Schedules <br /> ® The schedules were developed based upon the project deadline from the client. SGM managed to provide <br /> adequate resources to meet each step of the design process. The schedule was updated on a weekly basis. The <br /> • PM had weekly meetings to discuss the design completion schedule and other requirements to meet the deadline & <br /> its construction budget. <br /> • <br /> • Scheduling Challenges <br /> The staff is experienced and has adequate resources to meet the deadlines and stay within construction budget. <br /> • Specific challenges in scheduling may include project phasing, scheduling so construction is during a certain time of <br /> ® the year (i.e. Remodeling a dormitory during the summer, when less students are at the campus), or scheduling <br /> construction at night so an office building can remain occupied during the day. Weekly meetings were scheduled <br /> • with PM, engineers & designers to make sure that the deadline & the construction budget was met. Then, regular <br /> meetings were set up with the owner to make sure that all the items, guidelines and other issues relating to the <br /> • project had been implemented. <br /> Team Communication <br /> ® SGM has established Communication procedures to maintain a critical flow of project information. In order for our <br /> • personnel to stay connected to their assigned tasks and their co-workers as required, we have ensured that our <br /> staff is equipped with the most up to date communications technology. <br /> • <br /> ® As with most corporations, we use Microsoft Office Applications such as Outlook, to communicate quickly and <br /> effectively. We propose to facilitate the use of an FTP site for fast transmittal to secure oversized files. Additionally, <br /> • SGM's team will utilize a video and phone conference software called GoToMeetings. This will allow our team to <br /> ® visually review documents and hold meetings from any part of the country. <br /> • The majority of the Project Delivery team and certain corporate staff members also stay connected through the use <br /> of synchronized "Smartphones” that allow instant access to emails, documents and calendar events. Users are <br /> • also provided Broadband and available VPN connections for access to the intemet, Team intranet and shared <br /> ® drives as necessary. <br /> • Response Time and Communication <br /> • Our staff is readily available for an emergency site visit, telephone and video conferencing and email <br /> communication. Additionally, City staff has ability to be in continual communication with SGM's lead personnel and <br /> • project managers to obtain a prompt response to questions and concerns 24 hours a day through the use of smart <br /> phones equipped with email access and ability to upload and edit documents. <br /> • SSGGMM <br /> • ENGINEERING! <br /> MET Cl/MOLTING E'G.Uu tI <br /> • <br />