Laserfiche WebLink
• <br /> • Adam Kerr, P.E. <br /> • Relevant Experience cont. <br /> • Florida Atlantic University (FAU) Continuing Minor Civil Engineering (Multiple Projects), FL— Kimley-Horn is <br /> • providing a variety of services for FAU at its multiple Florida campuses. Provided traffic engineering services for <br /> • the FAU Boca Raton Campus Broward Avenue and Volusia Street Traffic Signal project in Boca Raton. The project <br /> • involved design of a new traffic signal at the intersection of Broward Avenue and Volusia Street on the FAU Boca <br /> Raton Campus. <br /> ® Transportation Element, Comprehensive Plan Amendment, Greenacres, FL— Served as project engineer. KHA <br /> performed the update to the Transportation Element for the City of Greenacres Comprehensive Plan. KHA used the <br /> • WPBUSA FSUTMS planning model to forecast future traffic conditions in order to determine future roadway levels <br /> • of service. The WPBUSA FSUTMS planning model was modified to determine the short- and long-range needs <br /> for the City roadway network and identify mitigation measures. KHA also provided direction to the City regarding <br /> its designation of future motorized and non-motorized traffic circulation systems with the improvement to those <br /> • existing systems throughout the City of Greenacres. <br /> • SR 7 Corridor Master Plan, Palm Beach County, FL— Developed a long-range plan to guide future growth <br /> ® and redevelopment along a corridor which was operating at over-capacity conditions at its ultimate width. The <br /> • document outlined measures to improve mobility along the corridor through optimized transit service, car-pooling <br /> programs, and promotion of mixed-use development and redevelopment. The planning process was coordinated <br /> • with Palm Beach County, the Village of Wellington, the Village of Royal Palm Beach, the City of Greenacres, and <br /> • individual land owners along the corridor. <br /> • US 1 Corridor Modification Study, Delray Beach, FL— Prepared an analysis of conditions prior to and after <br /> • a lane reduction on a major corridor through Delray Beach. Aspects of the study included traffic volumes at <br /> intersections and generally along the corridor, speeds, and accident data. The corridor study was part of a larger <br /> ® <br /> project which analyzed the qualitative effects of decreased number of travel lanes, increased sidewalk width, and <br /> • increased landscaping. The project involved extensive public coordination with the City of Delray Beach, FDOT, and <br /> • the Delray Beach Community Redevelopment Association. <br /> • Florida Research Park Traffic Analysis, Palm Beach County, FL— Developed in-depth development of regional <br /> • impact level traffic analysis to determine the impacts of the Scripps Research Institute at Florida Research Park. <br /> The project involved a comprehensive review and analysis of long-term traffic patterns in the northwestern portion <br /> • of Palm Beach County and southern Martin County. Provided extensive FSUTMS modeling support as part of the <br /> • analysis. Coordinated the analysis and results with FDOT, Treasure Coast Regional Planning Council, and Palm <br /> ® Beach County. <br /> • SR 7/Pioneer Road Signal, Royal Palm Beach, FL—Served as project manager. Kimley-Horn designed a traffic <br /> ® signal at the intersection of SR 7 and Pioneer Road in Royal Palm Beach. The mast-arm design included a dual- <br /> arm design, with one of the arms spanning a six-lane approach to the intersection. The design required special <br /> • consideration for drainage and topography. Construction had to be coordinated with the widening of SR 7, as well <br /> • as the widening of Pioneer Road. <br /> • Roebuck Road, SR 7 to Jog Road, West Palm Beach, FL—Served as signal designer. Kimley-Horn provided <br /> • drainage analysis and design, signing and pavement marking, and signal plans. We were also responsible for <br /> environmental permitting services <br /> ® <br /> Traffic Concurrency Management Database and Report, Miami Lakes, FL— Created and maintained a database <br /> to inventory the existing and allowable traffic within the Town of Miami Lakes. Assisted in developing a methodology <br /> • for determining traffic concurrency in the Town. <br /> • Various Traffic Signal Designs, Palm Beach County, FL— Prepared plan sets and opinions of probable cost for <br /> • several private sector developers. Coordinated the structural analysis, geotechnical analysis, and the permit and <br /> • approval processes. Designs were on major thoroughfares and required agency approval from FDOT, Palm Beach <br /> County, municipalities, and various utility companies. <br /> • RFO No.12-04-02 Ian Kimley-Horn <br /> • 0Y30mis 12o Sunny Isles A&E Series rcwmesindd \I� and Accnciates.Inc <br /> 3-9 <br />