My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:10:07 PM
Creation date
2/11/2016 4:10:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®al C• OringEtit4,. Professional Category <br /> r _ = 9 g J CIVIL/ENVIRONMENTAL <br /> ®I ` xt s o per' ENGINEERING RFQNo.,za,02 <br /> 0 <br /> $ 48-inch force main and continue south approximately 3,000 linear feet across the Oleta River State Recreation <br /> ® Area to the MDWASD North District Wastewater Treatment Plant, where it will connect to the chloride side <br /> of the plant. The project will require an aerial crossing of the Oleta River, and coordination with FDEP for <br /> • proposed impacts to State Wetlands. <br /> ® Water Main Route Evaluation Report, West Palm Beach,FL <br /> o As a result of the Florida Department of Transportation (FDOT) relocating the Flagler Memorial Bridge, the <br /> City of West Palm Beach was required to relocate an existing subaqueous 24-inch water main that conflicted <br /> o with the new bridge location. To implement the most beneficial relocation route for the City, we developed a <br /> ® water main route evaluation report. The project included evaluating four alternative water main alignments <br /> to cross the Intracoastal Waterway from the City of West Palm Beach to the Town of Palm Beach. The report <br /> 0 discussed community impacts, constructability, permit feasibility, and a recommendation to proceed with a <br /> ® preferred water main route. Extensive coordination was required with project stakeholders such as the Florida <br /> ® Department of Environmental Protection (FDEP), Army Corp of Engineers (ACOE), Florida Department of <br /> Transportation (FDOT), Palm Beach County Health Department (PBCHD), City of West Palm Beach, and the <br /> O Town of Palm Beach to identify requirements, concerns and obtain feedback pertaining to issues that affect <br /> ® the permitting, design, construction, schedule, and cost of the proposed project. A primary focus of the <br /> ® project was to develop a design and construction schedule that will comply with FDOT's schedule to begin <br /> construction of the new Flagler Memorial Bridge in 2010. The City's existing water main must be relocated <br /> 0 before the start of bridge construction. The proposed water main routes included both upland open-cut and <br /> ® subaqueous horizontal direction drill segments for all of the approaches. The final water main route evaluation <br /> report summarized stakeholder issues, permit feasibility, project timeframes, preliminary opinions of probable <br /> O cost, and included a recommendation to proceed with the preferred route. The report also included proposed <br /> ® connection points, overall pipe lengths, construction methods, pipe material, and known or potential issues <br /> ® and constraints for each route. Based on an approved water main route evaluation report, the project has <br /> moved into the design phase. <br /> ® r12 - �— is..al Palm <br /> ® Force Main System Study,Palm Beach,FL6S3 —i a�� ,e ....,-....—t= <br /> Kimley-Horn is currently developing a system wide force main X`y N <br /> ® model for the Town to evaluate the improvements necessary to A 1t = 13'1, <br /> determine theappropriate force main sizes and station upgrades t‘c.;...: , ` I • <br /> $ necessary to abandon the practice of pumping wastewater through tr - .' i��i - <br /> ® the City of Lake Worth force main system. This analysis includes <br /> sr <br /> ® additional flows from Manalapan and South Palm Beach and • <br /> will ultimately lay the ground work for the system improvements fi# €. <br /> ® required to allow flows to travel to the East Central Regional Water Wall. •.i{ / <br /> =, <br /> ® Reclamation Facility through only the force main shared by the 3'4 ,r.- <br /> Town and the City of West Palm Beach. WaterGEMS is being used �' , <br /> ® to model the system and provides the Town the added benefit of , , <br /> being able to import the model graphics into the Town's existing '-e +;i E <br /> ® <br /> GIS database. <br /> kz <br /> t; <br /> ti <br /> 0 <br /> ® RFO No.12-04-02 ��^ Kimley-Horn <br /> 0Y260015 12o Sunny Isles Civil =mnm <br /> ronental Eng!odd ti Mr 1 and Associates,Inc. <br /> 0 2-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.