Laserfiche WebLink
® Kevin Schanen, P.E. <br /> Page 2 <br /> A <br /> Representative Experience (continued) <br /> ® Town of Palm Beach D-10 Stormwater Pumping Station, Palm Beach, FL— Project manager for the design of <br /> ® this stormwater pumping station. Project includes expanding the existing station from a capacity of 78,000 <br /> ® GPM to 150,000 GPM, generator and ventilation system design, and associated collection system upgrades. <br /> ® Jupiter Water High Service Pumps 17 &18, Jupiter, FL— Served as project manager for the installation of <br /> two high service pumps at the Central Blvd. water storage facility. Due to water restrictions, the peak flows <br /> ® demanded by the system outpaced the high service pumping capacity of the water treatment plant on the <br /> ® days that irrigation is allowed by the water management district. The installation of the final two pumps in the <br /> ® transmission system matrix will allow the Town to keep pace with the irrigation demand while maintaining a <br /> consistent system pressure. <br /> ® <br /> Town of Palm Beach D-15 Cooling System, Palm Beach, FL— Serves as project manager for the design of <br /> cooling water wells and heat exchanger replacements to support the cooling needs of nine diesel engine <br /> driven hydraulic stormwater pumps in the Town of Palm Beach. Interior piping modifications as well as heat <br /> ® exchanger replacements are also included in this project. <br /> ® Indian River County Utilities West Transmission Force Main, In-Line Pump Station, Vero Beach, FL— Served <br /> ® as project engineer for the design of an in-line pump station from an existing master pump station to <br /> divert wastewater capacity from their South Regional Wastewater Treatment Facility to their West Regional <br /> ® Wastewater Treatment Facility. This approach not only addressed their master planning efforts, but eliminated <br /> ® odor issues at the existing facility, allowed planned rehabilitation at the existing pump station, and provided <br /> much more flexibility in diverting wastewater to either of their facilities. <br /> Town of Palm Beach Sanitary Inline Booster Pumping Station, West Palm Beach, FL— Served as project <br /> ® manager to provide design services for this 5-MGD sanitary sewer inline booster station which will allow the <br /> Town to demolish an existing pump station and enter directly into the West Palm Beach forcemain system <br /> near 23rd Street and Tamarind Avenue. The design included influent and effluent forcemain modifications, <br /> ® construction of a new electrical building, installation of a 350 kW emergency generator, and the installation of <br /> ® five VFD driven centrifugal wastewater pumps. The pumps were designed to be installed in an exterior, above <br /> ground, dry condition so that costs could be saved by constructing a smaller building. <br /> Town of Palm Beach In-line Booster Pumping Station, Palm Beach, FL— Served as project manager to provide <br /> ® conceptual design services for this five-MGD sanitary sewer inline booster station which will allow the Town to <br /> ® demolish an existing repump station and enter directly into the West Palm Beach force main system near 23rd <br /> ® Street and Tamarind Avenue. The design included influent and effluent force main modifications, construction <br /> of a new electrical building, installation of a 350-kW emergency generator, and the installation of five VFD- <br /> O driven centrifugal wastewater pumps. <br /> Town of Palm Beach Sanitary Pumping Stations, Palm Beach, FL—Serving as project manager providing <br /> ® design services for this 5-MGD sanitary sewer inline booster station which will allow the Town to demolish <br /> an existing pump station and enter directly into the West Palm Beach force main system neear 23rd Street <br /> and Tamarind Avenue. The design included influent and effluent force main modificiations, construction of a <br /> ® <br /> new electrical building, installation of a 350-kW emergency generator, and the installation of five VFD-driven <br /> centrifugal wastewater pumps. The pumps were designed to be installed in an exterior aboveground dry <br /> condition so that costs could be saved by constructing a smaller building. <br /> 0 <br /> 0 <br /> 0 <br /> RFC No.12-0402 P—Il Kimley-Horn <br /> O 0Y20C015.t2o Sunny Isles CM Emtromnental By Resumes.indd a I and Associates.Inc <br /> 3-28 <br />