My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn - Landscape
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn - Landscape
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:12:03 PM
Creation date
2/11/2016 4:12:03 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 ((�� ` ' = C^ ressonato q � mter <br /> ® at <br /> rt _ LANDSCAPE <br /> Pate Orgy re eite 4 <br /> ARCHITECTURE, RFQNa 12-04-02 <br /> wr• <br /> • Parks and Recreational Facilities Experience Vt�; .e� ;,.3p F <br /> • KHA has successfully completed numerous parks and <br /> 'rig's-- �f'�i y <br /> recreation-oriented projects for local, regional, state, and 's 2 f-- ~+ � * • <br /> ® federal government clients, as well as for many private s 1�f t. s - % +: -,a--5.-t4,__ ` t= <br /> • developments. We understand all aspects involved in r -.,h ,� ,, •%i_ <br /> `2' , ar-c r :rt to , <br /> • creating an effective, well-used recreation facility that '��i� aTill� � <br /> ® benefits the community. " , x �ta ` <br /> !ztzt <br /> • Several of our parks and recreational facilities have =;',r .2 t u <br /> received honors and/or awards. Veterans Memorial Park _ t ' (� <br /> in Pod St. Lucie received the Award for Design Innovation 444:"..4. . . , _sc �`'." Y <br /> • from the Florida Parks and Recreation Association and _. _ __ <br /> • Jupiter Community Park has been selected multiple Play structure at La Gorcc Parkin Miami Beach <br /> • times to host the Women's World Series. Our local staff <br /> has been directly involved in the design of more than <br /> • S20 million in park construction in South Florida. <br /> • <br /> • ll — Maintenance Programs <br /> � We know that a successful site development <br /> • air.�,r'_it+f1 ,_ <br /> project requires an effective maintenance plan. This <br /> • • <br /> ® \ � -4 > x f maintenance plan must match the capabilities and <br /> /.'?r ;, available workload of your maintenance staff. Our <br /> : tae, _. - e a goal is to provide a site layout and master plan that <br /> ® Ili., ' f — `,i� incorporates sound horticultural practices, including <br /> • II proper plant selection, planting bed layout, and <br /> r~ } �, } consistent irrigation materials. <br /> ._.�.. <br /> ® 6 � Permitting and Approvals <br /> Our landscape architects and planners maintain <br /> • - -- - - regular contact with dozens of local, state, and federal <br /> • South Collier Boulevard,Marco Island regulatory agencies and their decision-makers. This <br /> ® rich network of interpersonal relationships enables <br /> us to provide expeditious services relative to agency <br /> • reviews and approvals. Our staff understands agency procedures and their expectations, enabling us to <br /> • minimize delays and revision of submittals. We also stay well informed regarding the latest changes and <br /> status of rules affecting permitting and regulation. As a result, we are equipped to assist you with permitting <br /> • and various mitigation program development processes. Additionally, we have successfully represented our <br /> • clients before numerous federal, state, and local agencies, including the South Florida Water Management <br /> • Department (SFWMD), Florida's regional planning councils, the US Army Corps of Engineers (USAGE), the <br /> Environmental Protection Agency (EPA), the US Fish &Wildlife Service (USFWS), and municipal and county <br /> • engineering divisions. We are experienced in preparing permit applications for these agencies, know what <br /> • is required to gain approval, and excel in providing a high level of coordination that facilitates the permitting <br /> • process. <br /> • <br /> • <br /> ® <br /> RFC)No.12-04-02 I Kimley-Horn <br /> UL30001=.12o Sunny Isles Landscape Arcrutecture.indd `I=r 1 and Associates,Inc, <br /> • 2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.