Laserfiche WebLink
® Jonathan laigh, ROLA <br /> ® Project Manager <br /> ® Representative Experience Special Qualifications <br /> C) Parks Master Plan, Cutler Bay, FL—Served as project manager. Kimley-Horn provided master 0 Has 16 years of experience <br /> 0 planning services for the Town of Cutler Bay to assess the condition and provide improvement as a practicing professional <br /> recommendations for eight Town parks. The team held public meetings with citizens, Town staff, landscape architect <br /> ® and public officials for input. The master plan included a physical inventory and site assessment o Skilled designer with park-related <br /> ® of the existing parks and park system and made proposed recommendations. project experience throughout <br /> the Southeast United States: <br /> C) Sugar Sand Park Design, Boca Raton, FL—Landscape architect for the KHA team responsible eight community parks of 60 <br /> for the development of Phase IV of Sugar Sand Park, including site planning, environmental <br /> 0 acres and greater, more than 20 <br /> ® permitting, civil, landscape,and architectural design. The first design package was for civil, passive parks of varying size, and <br /> electrical, landscape, and hardscape improvements for installation ora carousel. more than 50 miles of dedicated <br /> ® <br /> Miller Park, Delray Beach, FL—Served as landscape architect for the Kimley-Horn team that greenways <br /> provided detailed site planning, design, and construction phase services for this S7-million o Contributed, managed,and/ <br /> ® upgrade to the existing baseball facility.This project featured a native plant palette and an easy- or produced seven recreation <br /> ® to-maintain landscape design. master plans in five different <br /> states <br /> 10 Vizcaya Park(formerly known as Bluegrass Lakes Park), Miramar, FL—Landscape architect. o Directed the preparation of park- <br /> ® This 20-acre park in Miramar provides several active recreational opportunities, including related construction drawings, <br /> lighted baseball fields, a soccer/multiuse field, and basketball courts. The park's passive detailing, and specifications <br /> • features include open picnic areas, a playground, and a jogging/fitness trail along the perimeter <br /> of the project site. Kimley-Horn provided master planning, landscape architecture, engineering o Experienced in applying a <br /> ® design and permitting services as well as construction observation and administration. This practical and budget friendly, yet <br /> 0 project is currently seeking LEED®Silver certification under the U.S. Green Building Council creative design approach to each <br /> LEED® (Leadershipin Energyand Environmental Design) building <br /> green certification system project <br /> ® and, if achieved, it will be the first LEED® certified building in he City. The City also plans to o Proficient in applying sustainable <br /> ® construct a 10,000-square-foot civic center, press box. concession stand,and storage area at principles in project design <br /> ® the site during later phases. and incorporating the design of <br /> ® Florida-friendly landscapes and <br /> Martin Luther King,Jr. (MLK) Drive Beautification, Delray Beach CRA, Delray Beach, FL water-efficient irrigation systems <br /> ® Project manager on the Kimley-Horn team. Provided landscape architectural master planning <br /> ® services for the design of landscape, lighting, and hardscape enhancements for the entire Professional Credentials <br /> ® length of Martin Luther King, Jr. (MLK) Drive in Delray Beach. This 1.5-mile corridor will also Bachelor of Landscape Architecture, <br /> incorporate MLK commemorative design elements placed in the right-of-way. The design University of Arkansas <br /> C) concept included the continuation of an existing sidewalk network; decorative lighting; right- Registered landscape Architect in <br /> ® of-way plantings with flowering trees, palms, and other landscaping; a program for live oaks to Florida <br /> ® be planted outside of the right of way; and artwork on existing utility poles. The master plan will <br /> also address prioritization and phasing of the proposed improvements with respect to budget. Professional Organizations <br /> ® Similar to other community enhancement master plans, public involvement is a key element American Society of Landscape <br /> ® n the success of this project. The Kimley-Horn team coordinated closely with a committee <br /> of community representatives to identify community assets and to solicit their ideas and Architects Chapter Secretary <br /> 0 preferences for incorporation into the master plan. Florida Recreation and Parks <br /> ® Association <br /> 24th and 25th Street Improvements,West Palm Beach, FL—Landscape architect for the U.S. Green Building Council <br /> ® Kimley-Horn team retained by the City of West Palm Beach to provide streetscape improvements <br /> • in the Northwood neighborhood area. This project is a joint effort between the City of West <br /> ® Palm Beach and the West Palm Beach Community Redevelopment Agency (CRA) to reconstruct <br /> each of the two-lane roadways with on-street parallel parking on both sides, thus creating <br /> ® <br /> ppUN Kimley-Horn <br /> PIC No.12-0+-02 O r 1 and Associates,Inc <br /> "_30Opi&12o Sunny Isles land pp Ac uteaure Resumes.indd 3-3 <br />