My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn - Landscape
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn - Landscape
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:12:03 PM
Creation date
2/11/2016 4:12:03 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conit <br /> j _ 1F Professional Category: <br /> • <br /> ® Avehate) a �� = LANDSCAPE <br /> S i <br /> ® ��it ,g. � Fat � ! ARCHITECTURE; FRI No.12-040 <br /> • <br /> ® Home Office Address, Telephone Number, and Local Address and <br /> • Phone Number <br /> • Kimley-Horn's corporate headquarters is located at: <br /> • <br /> O 3001 Weston Parkway <br /> Cary, NC 27513-2301 <br /> • (919) 677-2000 <br /> • Kimley-Horn's local office for RFQ No. 11-11-01 is: <br /> • 1920 Wekiva Way, Suite 200 <br /> West Palm Beach, FL 33411 <br /> • <br /> (561) 845-0665 <br /> • <br /> • List of Any Outstanding Litigation That Would Threaten the Viability of <br /> the Firm or the Performance of this Contract <br /> • A list of IGmley-Horn's outstanding litigation is provided as pail of the Dispute Disclosure Form located in <br /> O Section 6. <br /> ® Proof of Insurance <br /> • <br /> • A copy of Kimley-Horn's standard certificate of insurance is included at the end of this section. Please note <br /> that Kimley-Horn will issue a project-specific Certificate of Insurance once we are under contract. <br /> ® Time Required to Implement Services After Work Authorization <br /> Please refer to the sample project schedule provided in Section 2. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> S <br /> 0 <br /> ® <br /> RFC/No.12-04-02Kimley-Horn <br /> UL3DWt-.t2o Sunny Isles Landscape Architecture.indd r� and Associates,Inc, <br /> ® 1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.