Laserfiche WebLink
TOM KRIPS CONSTRUCTION Estimate/Proposal <br /> 3120 S. ANDREWS AVENUE DATE ESTIMATE# <br /> FT LAUDERDALE, FLORIDA 11/16/2015 S4071 <br /> 33316 <br /> OFFICE 954-522-2086/ 2088 <br /> NAME/ADDRESS <br /> PEDESTRAIN PARK ACCESS TOWERS <br /> SUNNY ISLES <br /> • RIC-MAN INT,L INC. <br /> ATT: VICTOR MENOCAL <br /> VictorM @Ric-Man.us <br /> PROJECT <br /> DESCRIPTION QTY COST TOTAL <br /> 6 MIL. POLY 1 85.00 85.00 <br /> #3 STIRRUPS 755 2.50 1,887.50 <br /> #4 REBAR 970 0.35 339.50 <br /> #5 REBAR 5,939 0.54 3,207.06 <br /> #6 REBAR 3,394 0.77 2,613.38 • <br /> #7 REBAR 3,038 1.05 3,189.90 <br /> #8 REBAR 3,245 1.36 4,413.20 <br /> #9 REBAR 702 1.74 1,221.48 <br /> 5000# PUMPMIX CONCRETE 148 126.00 18,648.00 <br /> BLOCK WORK LABOR AND MATERIAL 8" 149 4.50 670.50 <br /> BLOCK WORK LABOR AND MATERIAL 12" 936 5.75 5,382.00 <br /> CONCRETE FORM MATERIAL 2,800.00 2,800.00 <br /> HARDWARE (MATERIAL) 1,650.00 1,650.00 <br /> EQUIPMENT BOBCAT/MINI-X 16 85.00 1,360.00 <br /> 2"/3"CONCRETE PUMP 40 85.00 3,400.00 ' <br /> 40 TON CRANE 16 115.00 1,840.00 <br /> PICK-UP AND DELIVER MATERIALS TO 24 50.00 1,200.00 <br /> JOBSITE <br /> MATERIAL 54,082.52 <br /> SECOND TOWER 185,288.00 185,288.00 <br /> TOTAL $370,576.52 <br /> SIGNATURE OF ACCEP... <br /> Page 3 <br />