My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
edet1 B ! ° Imo, I CA DES,INC. <br /> 921 SHOTGUN ROAD <br /> SUNRISE, FLORIDA 33326 <br /> Phone 800-432-5031 <br /> 6.23.14 Sunny Isles Pedestrian Bridge <br /> DOT# DESCRIPTION U/M Price /� <br /> 999-1 Labor Si material for full Road Closure(1 day rental included) ea $4,332.52 l/ <br /> on SR 826 (ped bridge location) <br /> (Full closure @ Ped Bridge:detour NB&SB)Setup/breakdown once <br /> 999-2 Labor Si material for WB RLC Single Lane(1 day rental included) ea $775.00 <br /> 999-3 Labor&material for WB LLC Single Lane(1 day rental included) ea $1,250.00 <br /> Rental rates: if necessary <br /> workzone signs(per Fdot specs ground mounts, portables) ed $0.45 <br /> drums/barricades/cones(missing cone fee$20 ea) ed $0.25 <br /> Type III (per Fdot specs) ed $1.00 <br /> arrowboard (per Fdot specs) ed $15.00 <br /> VMS(per Fdot specs) ed $30.00 <br /> MOT crew on site(2 persons) hr $130.00 <br /> Additional Charges <br /> MOT plan(simple overview)(certified not sealed)(per sheet) ea $150.00 <br /> job minimum ea $250.00 <br /> • <br /> Prices are firm for(30)days. <br /> By agreeing to this quote,it becomes a part of any resulting contract. <br /> Bob's Barricades will not be responsible for failure to provide equipment in quantities <br /> which exceed those specifically detailed in the plans. <br /> these increased quantities require change orders. <br /> This quotation in no way authorizes the use of any Bob's Barricades personnel <br /> and/or their certification as worksite traffic safety supervisor. <br /> 72 hour notice is required prior to delivery of MOT devices. <br /> Signs are standard legend and size only. Workzone signs are ground mounted only <br /> This project may require bridge/barrier wall/elevated roadway mounted sign supports. <br /> These workzone signs supports are not included in unit price and will incur additional charges. <br /> These types of installations above active roadways are prohibitive, <br /> Covering or uncovering of signs are not included in above price. <br /> Unit prices above do not include labor for lane closures,special detours and traffic switches unless spe <br /> Unscheduled, late,last minute deliveries,pickups,may incur an additional cost. <br /> Deliveries need to be coordinated as early as possible to avoid delivery charges. <br /> LCD(pedestrian longitudinal channeling device)is not included in the 102-74-1 item. <br /> Lump sum payment schedule to be mutually agreed on prior to the execution of contract. <br /> Prompt payment within 30 days is expected. <br /> Pay-when-paid stipulations will not exceed 60 days from invoice due date. <br /> quoted by John Baldwin jbaldwin @bobsbarricades.com; <br /> � r� <br />
The URL can be used to link to this page
Your browser does not support the video tag.