My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anzac Contractors, Inc. <br /> 7475 S.W. Fiftieth Terrace <br /> CO) 7475 Florida 33155 <br /> Tel:305.669.1986 <br /> Li) Fax:305.669.1180 <br /> September 19, 2013 <br /> Ric-Man International, Inc <br /> 220 715t Street, Suite 206 <br /> Miami Beach, Fl 33141 <br /> Attn: Victor G. Mental <br /> Re: Proposal for Sunny Isles Beach Gateway Park Pedestrian Bridge <br /> 3 2 RFQ No. 13-08-01 <br /> 3.x� <br /> We are pleased to offer our quote as follows: <br /> ry Foundations, Assembly & Erection, Superstructure Bridge Deck, Prefabricated <br /> Stairs for the Conceptual Pedestrian Bridge. <br /> Lump Sum$280,000.00 <br /> Included: <br /> - Augercast Piles under the foundation at each end of the bridge (2 End Bents) <br /> - Cast-in-place concrete Substructure Foundations at grade over the Augercast <br /> Piles <br /> - Receive, assemble and erect Pedestrian Bridge <br /> - Bolting at splices per FOOT Specification using a Skidmore Wilhelm Calibrator <br /> - Receive, assemble and erect Prefabricated Stairs at each end of the bridge <br /> - Touch up painting of bridge and stairs after erection <br /> - Bridge deck expansion joints at each end of the bridge <br /> - All reinforcing steel and concrete for the above items <br /> Excluded: <br /> - Purchase of Pedestrian Bridge and Stairs <br /> - Construction of any concrete towers and/or elevator shafts on top of the <br /> proposed "at grade" Substructure Pile Caps <br /> - Elevators <br /> - Lighting and electrical work <br /> - Maintenance of traffic <br /> - All testing and inspections <br /> - Survey and As-Builts <br /> - Performance bond, if required, the cost of a performance bond will be 2% of the <br /> contract price. <br /> - Permits <br /> - Clearing and grubbing <br /> - Site access to both sides of the bridge with hard, dry, level surfaces suitable for <br /> staging trucks cranes, tractor-trailer rigs and during all phases of construction. <br /> - Erosion control items <br /> SRMIRMI 001 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.