My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gOir RIC-MAID INTERNATIONAL, INC. loth <br /> GENERAL CONTRACTORS <br /> 2601 Wiles Road•Pompano Beach, Florida 33073 <br /> Phone:(954)426-1042•Fax:(954)426-0717 <br /> process of procuring an FDOT <br /> agreement for one of their tots. <br /> Waiting on FOOT to provide <br /> • license agreement to City. <br /> 4 <br /> 100%Design Plans'-FDOT 10-Jul-15 28-Jul-IS 18 <br /> Approval <br /> Bridge Visibility from Existing 25-Sep- <br /> 5 Sign Structure-FDOT Approval 4-May-15 15 144 <br /> 6 Contech Pre-Fabricated Bridge 14-Aug-15 25-Sep- 42 <br /> Shop Drawing-FOOT Approval 15 <br /> 7 Color Kinetics Lights Shop 26-Jun-15 25-Sep- 91 <br /> Drawing—FOOT Approval 15 <br /> At the September 25th Meeting, <br /> • Sunny Isles Sign Structure Shop FDOT indicated that they wanted <br /> 8 Drawing FDOTApproval 14-Sep-15 ??? 16 a signed and sealed copy for their <br /> review. RMi procuring a signed <br /> and sealed copy. <br /> At the September 25th Meeting, <br /> FOOT indicated that RMI shall <br /> submit thru their Operations <br /> 9 Maintenance of Traffic Review 13-Jul-15 ??? 79 Divisions in lieu of this <br /> Shop Drawing—FDOT Approval Department, even though they <br /> had requested the submittal. <br /> RMI submitted to FOOT on the <br /> same day. Item Closed. <br /> RMI assumed using the existing <br /> FPL vault located at the north <br /> side from bid time since there is <br /> no other location to get power. <br /> 10 FPL Easement for Power Drop 14-Jan-15 ??? 259 City in the process of procuring <br /> easement for the approximate <br /> 10-Ft outside of the previous <br /> easement that was completed <br /> with the apartment building. <br /> Ongoing. We were advised by <br /> City that MDC Building <br /> Miami-Dade County and Sunny Department permit would not be <br /> 11 Isles Beach Building Department 27-Jul-15 ??? 65 required. We were advised that <br /> only we would be required to <br /> submit to the City of Sunny Isles <br /> Beach Bldg Dept.as a pass thru. <br /> 14-BRIXP•01 Time Extension Request <br /> C.' r—. <br /> u <br />
The URL can be used to link to this page
Your browser does not support the video tag.