Laserfiche WebLink
completion of the entire Project as long as any additions and revisions do not materially deviate from <br /> the information contained in City of Sunny Isles Beach RFP No. 13-08-01 Gateway Park Pedestrian <br /> Access Improvements— Step 2 Technical Proposal. A portion of the GMP shall be attributed to the <br /> design phase of the Project and the remainder attributed to the construction phase as further delineated <br /> in the attached Exhibit"A"titled Schedule of Values,which is incorporated herein by reference. <br /> 1.15 Notice of Award-The written notice by CITY to the CONTRACTOR stating that the <br /> CONTRACTOR is awarded the privilege to design and construct the Project on the condition that the <br /> Parties are able to negotiate,to the CITY'S complete satisfaction, and execute an Agreement for the <br /> design and construction of the entire Project. <br /> 1.16 Notice to Proceed - A written notice given by CITY to CONTRACTOR fixing the <br /> date on which the Contract Time will commence to run and on which CONTRACTOR shall start the <br /> design and construction phases under this Agreement. <br /> 1.17 Specifications — Shall be defined to mean the written technical descriptions, that <br /> accompany the Drawings of all materials, equipment and other construction systems, including the <br /> quantity and quality associated therewith, as well as other standards and workmanship as applied to <br /> the Work and certain administrative details applicable thereto that the CONTRACTOR is obligated <br /> to prepare to the complete satisfaction of the CITY which is deemed one hundred percent (100%) <br /> complete for the construction of the entire Project. <br /> • <br /> 1.18 Substantial Completion. Means that point at which the Work is at a level of <br /> completion in substantial compliance with the Agreement such that the City can use, occupy and/or <br /> operate the Project in all respects to its intended purpose. Substantial Completion shall not be deemed <br /> to have occurred until any and all government entities, which regulate or have jurisdiction over the <br /> Project, have inspected and approved the Project. Beneficial use or occupancy shall not be the sole <br /> determining factor in determining whether Substantial Completion has been achieved, unless a <br /> temporary certificate of occupancy has been issued. <br /> 1.19 Project—The Project means the design and construction of a Pedestrian Bridge over <br /> westbound SR 826(aka Sunny Isles Boulevard)to connect a parcel of City-owned property that lies <br /> between eastbound and westbound SR826 ramps. The services include Design Services, Survey, <br /> Permits,MOT,Demolition,Construction,Coordination with all Utility Relocations,Design,Review, <br /> Best Value Analysis including cost estimates, GMP and Project management and coordination with <br /> City personnel (per the DCP 5 of 27), and as generally described information contained in City of <br /> Sunny Isles Beach RFP No. 13-08-01 Gateway Park Pedestrian Access Improvements — Step 2 <br /> Technical Proposal, and all other incidentals thereto identified by the CITY during the design and <br /> construction phases of the Project which the CITY concludes,at its sole discretion,are required to be <br /> included complete the Project. <br /> 1.20 Subcontractor - An individual, firm or corporation having a direct Contract with <br /> CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the <br /> site. <br /> 1.21 Supplier-A manufacturer, fabricator,supplier, distributor,materialman or vendor. <br /> 4 ; <br />