My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 2.1.6 Notice of Award and Notice to Proceed. <br /> 2.1.7 Clarifications and Exclusions. <br /> 2.1.8 All applicable provisions of State, Federal or local law. <br /> 2.1.9 Any modification, including all Change Orders, Field Orders and Written <br /> Amendments duly delivered after execution of Agreement. <br /> 2.2 Entire Agreement and Contract Interpretation. <br /> The Contract Documents comprise the entire agreement between CITY and <br /> CONTRACTOR concerning the Work. This Agreement shall be governed by the laws of the State <br /> of Florida, without regard to its conflict of law provisions. The Contract documents are intended <br /> to be complementary and interpreted in harmony so as to avoid conflict,with the express qualification <br /> that the Contract Documents must be read in such a manner as to afford the greatest possible <br /> protection to the CITY, including, but not limited to, ensuring that all of the Design-Build Work <br /> for the Project is completed within the warranted Guaranteed Maximum Price. <br /> 2.3 Amending and Supplementing Contract Documents. <br /> The Contract Documents may be amended to modify the terms and conditions of the <br /> Agreement in one or more of the following ways: <br /> 2.3.1 A Change Order; <br /> 2.3.2 A Written Amendment; <br /> 2.3.3 A Work Change Directive. <br /> 2.4 Supplements,Minor Variations or Deviations. <br /> CITY will not authorize any Change Orders to the Contract Documents, except in a <br /> manner set forth in this Agreement and allowed by law. CONTRACTOR covenants and agrees that <br /> CITY shall not be responsible for the costs above those set forth herein unless the same are set forth <br /> in a Change Order. Any and all Change Orders issued by the authority of an entity not a party to this <br /> Agreement shall not be compensated by CITY, and shall not constitute a Change Order. <br /> 2.5 Representation of CONTRACTOR. <br /> Execution of the Contract by the CONTRACTOR is a representation that <br /> CONTRACTOR has visited the site and become familiar with the local conditions under which the <br /> Work is to be performed. <br /> 2.6 Before Commencing Operations. <br /> 6 ril ! : 'i <br />
The URL can be used to link to this page
Your browser does not support the video tag.