My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
techniques, sequences and procedures of construction. CONTRACTOR shall be responsible to see <br /> that the finished Work complies with the Contract Documents. <br /> 6.8 Project Management. <br /> 6.8.1 During the progress of on-site construction, CONTRACTOR shall provide full time <br /> (defined to be 8:00 a.m. through 5:00 p.m. Monday through Friday, legal holidays excluded) <br /> competent project supervision and any necessary assistants who shall not be replaced without written <br /> notice to CITY. The superintendent will be CONTRACTOR'S representative at the site. <br /> 6.8.2 The day to day management of the Project's subcontractors and vendors contracts, <br /> schedules sand requests for payment shall be by a competent project manager to whom the <br /> superintendent shall report. The project manager will conduct regularly scheduled project meetings <br /> for the purpose of project coordination and communication. The project manager shall be included <br /> in the cost of the Work. <br /> 6.9 Labor. <br /> 6.9.1 Construction services shall be performed only by qualified construction contractors <br /> licensed to do business in the State of Florida and suppliers,selected and paid by the CONTRACTOR. <br /> 6.9.2 CONTRACTOR shall provide and pay for competent,suitably qualified personnel to <br /> perform the work as required by the Contract Documents. CONTRACTOR shall not permit <br /> employment of unfit persons or persons not skilled in tasks assigned to them. CONTRACTOR shall <br /> at all times maintain good discipline and order at the site. <br /> 6.10 Materials. <br /> 6.10.1 Unless otherwise specified herein,CONTRACTOR shall furnish,pay for and assume <br /> full responsibility for all materials, equipment, transportation, machinery, tools, appliances, water, <br /> heat, utilities and all other facilities and services necessary for the furnishing, performance, testing, <br /> start-up and proper completion of the Work. <br /> 6.10.2 CONTRACTOR warrants that all materials and equipment shall be new and of good • <br /> quality and that the work will be free from defects in material and workmanship whether patent or <br /> latent in nature. All materials and equipment shall be applied, installed, connected, erected, used, <br /> cleaned and conditioned in accordance with the instructions of the applicable Supplier except as <br /> otherwise provided in the Contract Documents. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.