My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> and about the premises as well as all tools, appliances, equipment and machinery, and surplus <br /> materials, and shall leave the site clean and ready for occupancy by CITY. CONTRACTOR shall <br /> restore to original condition all property not designated for alteration by the Contract Documents <br /> including the area south of the work site where construction is currently occurring under a different <br /> Contract by others as further shown in the final design by CONTRACTOR or as otherwise approved <br /> in writing by the City. <br /> 6.17.3 CONTRACTOR shall not load nor permit any part of any structure to be loaded in <br /> any manner that will endanger the structure,nor shall CONTRACTOR subject any part of the Work <br /> or adjacent property to stresses or pressures that will endanger it. <br /> 6.18 Access to Work. <br /> CONTRACTOR shall provide CITY, CITY'S consultants, representatives and <br /> personnel, independent testing laboratories and governmental agencies with jurisdictional interests <br /> with access to the work at reasonable times for their observation, inspection and testing. <br /> CONTRACTOR shall provide them proper and safe conditions for such access;and shall advise them <br /> of CONTRACTOR'S site safety procedures and programs so that they may comply therewith. <br /> 6.19 Safety and Protection. <br /> 6.19.1 CONTRACTOR shall be responsible for initiating, maintaining and supervising all <br /> safety precautions and programs in connection with the Work to prevent damage, injury or loss to all <br /> employees on the work site and other persons and organizations who may be affected thereby;all the <br /> Work and materials and equipment to be incorporated therein, whether in storage on or off the site; <br /> and other property at the site or adjacent thereto. <br /> 6.19.2 CONTRACTOR shall comply with all applicable laws and regulations of any public <br /> body having jurisdiction for the safety of persons or property or to protect them from damage, injury <br /> or loss. <br /> 6.20 Indemnification. <br /> 6.20.1 GENERAL INDEMNIFICATION: The parties agree that one percent (1%) of the <br /> total compensation paid to CONTRACTOR for the Work under this Agreement shall constitute <br /> specific consideration to CONTRACTOR for the indemnification to be provided under this <br /> Agreement. CONTRACTOR shall indemnify, defend, save and hold harmless the CITY and the <br /> CITY's elected officials, public employees, consultants and separate contractors, any of their <br /> subcontractors, sub-subcontractors, agents and employees from and against any and all claims, <br /> damages, losses and expenses,including but not limited to attorneys'fees, arising out of or related to <br /> and/or resulting from performance of the Work. These indemnification obligations shall include <br /> claims, damages, losses or expenses (1) that are attributable to bodily injury, sickness, disease or <br /> death,or to injury to or destruction of tangible property(other than the Work itself) including loss of <br /> use resulting therefrom,and/or(2)to the extent such claims,damages, losses or expenses are caused <br /> in whole or in part by negligent acts or omissions of the CONTRACTOR,its employees,agents,and <br /> representatives, including those of CONTRACTOR's sub-contractor(s), and/or anyone directly or <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.