My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 7- CITY'S RESPONSIBILITIES <br /> 7.1 CITY shall furnish data required of CITY under the Contract Documents promptly. <br /> The CONTRACTOR understands and agrees that any information provided to it by the CITY as to <br /> any aspect of the Project is not guaranteed but contractor shall have the right to reasonably rely on <br /> any data provided by the City and the City shall not knowingly provide false or inaccurate data. <br /> 7.2 Contractor shall secure all necessary assessments, charges, approvals and permits <br /> required for construction,use,or occupancy of permanent structures or permanent changes in existing <br /> facilities. <br /> 7.3 If the Work is defective,or CONTRACTOR fails to supply sufficient skilled workers <br /> or suitable materials or equipment, or fails to furnish or perform the Work in such a way that the <br /> completed Work will conform to the Contract Documents,CITY may order CONTRACTOR to stop <br /> the Work, or any portion thereof, until the cause for such order has been eliminated; however, this <br /> right of CITY to stop the Work shall not give rise to any duty on the part of CITY to exercise this <br /> right for the benefit of CONTRACTOR or any other party. <br /> ARTICLE 8—CITY MANAGER <br /> 8.1 City Manager will be CITY'S contact person during the construction period and until <br /> final payment is due to CONTRACTOR. <br /> 8.2 Visits to Site. <br /> City Manager may, at the City Manager's sole discretion, make visits to the site to <br /> observe the progress and quality of the executed work. <br /> 8.3 Authorized Variations in Work. <br /> City Manager may authorize minor variations in the Work from the technical <br /> requirements of the Contract Documents which are mutually agreed to and do not involve an <br /> adjustment in the Guaranteed Maximum Price or the Contract Time and are consistent with the overall <br /> intent of the Contract Documents. These may be accomplished by a Field Order and will be binding <br /> on CITY and on CONTRACTOR who shall perform the work involved promptly. <br /> 8.4 Rejecting Defective Work. <br /> If City Manager becomes aware of any fault or default in the Work, he may give <br /> written notice thereof to CONTRACTOR.The failure to provide notice shall not waive the warranty <br /> of the CONTRACTOR that the work is to be free of defect whether latent or patent. <br /> ARTICLE 9-BUILDING DEPARTMENT'S RESPONSIBILITIES <br /> It is understood and agreed by the CONTRACTOR that the Building Department and its <br /> inspectors are professionals who are dedicated to providing efficient and courteous service to all <br /> 18 C`,7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.