Laserfiche WebLink
power, and roads, the conformation and conditions at the ground and all other matters which can <br /> in any way affect the Work or the Contract Amount. <br /> 13.2 The Contractor further acknowledges that it has satisfied itself as to the character, <br /> quality, and quantity of surface and subsurface materials to be encountered from evaluating <br /> information included in the Contract Documents. Any failure by the Contractor to acquaint itself <br /> with all the provided information will not relieve Contractor from responsibility for properly <br /> estimating the difficulty or cost thereof under the Contract Documents. <br /> ARTICLE 14. OWNERSHIP AND USE OF DOCUMENTS <br /> Contractor understands and hereby agrees that any information, document, report or any other <br /> material whatsoever which is given by the City to Contractor or which is otherwise obtained <br /> or prepared by Contractor pursuant to or under the term of this Agreement is and shall at all <br /> times remain the property of the City. Contractor agrees not to use any such information, <br /> document, report or material for any other purpose whatsoever without the written consent of the <br /> City, which may be withheld or conditioned by the City in its sole and absolute discretion. <br /> ARTICLE 15. PLANS, SPECIFICATIONS AND WORKING DRAWINGS <br /> 15.1 The City shall have the right to modify the details of the Plans, Specifications, and Working <br /> Drawings with additional plans, drawings or additional information as the Work proceeds, all of <br /> which shall be considered as part of the Contract Documents. <br /> 15.2 Where the Contractor believes that the modification or supplement is outside the Scope <br /> of the Work, the Contractor shall, within 72 hours, notify the City that the modification or <br /> supplement is outside the scope of the Work. At that time the modification or supplement may be <br /> rescinded or the Contractor may be required to submit a request for a Change Order proposal. <br /> Where the Contractor is notified of the City's position that the modification or supplement is <br /> within the scope of the Work and the Contractor disagrees, the Contractor shall notify the City <br /> Manager or his designee that the Contractor reserves the right to make a claim for the time and <br /> monies based on the modification or supplement. At no time shall the Contractor refuse to comply <br /> with the modification or supplement. <br /> 15.3 When, in the opinion of the City, it becomes necessary to explain the Work to be done more <br /> fully, or to illustrate the Work further, or to show any changes which may be required, <br /> supplementary drawings, with specifications pertaining thereto, will be prepared by the City or its <br /> Designee. The supplementary drawings shall be binding upon Contractor with the same force as the <br /> Contract Documents. Where such supplementary drawings require either less or more than the <br /> original quantities of work, appropriate adjustments shall be made by Change Order. <br /> 15.4 The City shall have the right to approve and issue Supplemental Instructions setting forth <br /> written orders, instructions, or interpretations concerning the Contract Documents or its <br /> performance. <br /> 10 ` ; <br />