Reso 2016-2524
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:29:34 PM
Creation date
3/2/2016 3:29:32 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2524
Date (mm/dd/yyyy)
02/18/2016
Description
CO #6 to Agmt w/Fla. Engineering & Dev. Corp for 174 St Roadway Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> FEB 1 0 2016 <br /> City of Sunny Isles Beach <br /> office of the City Manager 440 <br /> CONTRACT <br /> CITY OF <br /> sa• F�Qs,�PS�� SUNNY ISLES BEACH AMENDMENT <br /> c,Tr of suK P.14� <br /> AMENDMENT NUMBER: #6 DATE: 02/08/16 <br /> PROJECT: 174th St Roadway Improvement <br /> BID NUMBER: 14-11-01 <br /> RESOLUTION NUMBER: 2015-2401 <br /> ORIGINAL DOLLAR CONTRACT AMOUNT: $2,965,750.20 <br /> NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS:_ $475,422.39 <br /> DOLLAR AMOUNT OF THIS CHANGE ORDER: $246,803.53 =CREDIT/DIRECT PURCHASES: $0 <br /> NEW DOLLAR CONTRACT AMOUNT: $3,579,582.28 <br /> ORIGINAL CONTACT COMPLETION DATE 03.30.16 <br /> TOTAL OF PREVIOUS CHANGE ORDER DAYS: 50 <br /> AMOUNT OF DAYS PER THIS CHANGE ORDER: 20 <br /> NEW CONTRACT COMPLETION DATE: 06.08.16 <br /> DESCRIPTION OF SCOPE OR WORK CHANGES: <br /> The original design and scope contemplated the construction of 5-ft sidewalks and the addition of =— <br /> bicycle lanes using the existing 1-ft grass strip which is currently embedded in the sidewalk. Although <br /> the bike lane striping was eliminated via CO #4,the overall pavement width was maintained in order <br /> to retain the flexibility to add the bike lanes in the future. It has now been deemed more favorable for - <br /> the City and its residents, to forgo the concepts of bike lanes all together, in lieu of wider 7-ft <br /> sidewalks through the entire corridor.This change order represents the additional fee to construct this <br /> expanded scope along the full length of 174th, including within the Phase I limits which was previously <br /> • <br /> completed. <br /> NOTE: Unless specifically stated clearly elsewhere on this page,this contract amendment does NOT include an extension of <br /> time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment <br /> and sum agreed to In this document constitute a full and complete settlement of the matters set forth herein,induding all direct <br /> and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the Issues set forth in this <br /> document - <br /> Florida Engineering & <br /> CONTRACTOR: Development Corp (4?��CITY ATTORNEY: Hans Ottinot ,�� , <br /> CAPITAL PROJECTS MANAGER: /AI, <br /> Elko Linton-Dorsett <br /> CITY MANAGER: Christopher). Russo <br />
The URL can be used to link to this page
Your browser does not support the video tag.