My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2524
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:29:34 PM
Creation date
3/2/2016 3:29:32 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2524
Date (mm/dd/yyyy)
02/18/2016
Description
CO #6 to Agmt w/Fla. Engineering & Dev. Corp for 174 St Roadway Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Engineering&Development Corp <br /> 12076 NW 98th Ave. <br /> Gardens Fl.33018 FLO RIDA ENGINEERING . . <br /> &DEVELOPMENT CORP. <br /> ENONEE W N6 CONTRACTOR <br /> I rrr..,,151111)C !QVAI <br /> Project:NE 174th Street Roadway Improvements <br /> Scope of work:change to 7 feet the width of the Sidewalk to 7 feet,change the curbs at the medians to Type D curb <br /> Cotract time add:20 days. <br /> Location: NE 174th Street <br /> Date: 1/27/16 <br /> PROPOSED CHANGE ORDER No. 6 OPTION 4 Sidewalk T Widening <br /> I. EAST OF NBR PHASE I, II, III,IV <br /> ADD's PHASE II.III,IV <br /> 22 Aditional 2'to accomplish 7'Wide 6"Thick Concrete sidewalk 3000 <br /> psi Including H/C Sidewalks ramp as per plans this is the cost to add 521.78 sy $ 47.50 $ 24,784.44 <br /> 2 feet along of the sidewalk <br /> 23 Drainage Structures Modifications(flumes) 8.00 ea $ 2,350.00 $ 18,800.00 <br /> 24 Drainage Structures Type P-2 top exchange 2.00 ea $ 3,582.00 $ 7,164.00 <br /> 25 PHASE II,III,IV Type D curb 2,401.00 If $ 15.00 $ 36,015.00 <br /> Sub-Total ADDS PHASE II,Ill,IV $ 86,763.44 <br /> E) CREDITS: PHASE Ii,Ill,IV <br /> Due the new 22.5 feet wide of the road. <br /> 26 Modified FDOT F-Curb 2,401 LF $ 18.00 $ (43,218.00) <br /> 27 3"Type SP-9.5 Asphalt(2 Lifts)for Reconstruction Road East of <br /> NBR 375 SY $ 21.50 $ (8,060.11) <br /> 28 12"Limerock Base for Road Reconstruction 375 SY $ 15.60 $ (5,848.27) <br /> 29 12"Sub base Course for Road Reconstruction 375 SY $ 3.20 $ (1,199.64) <br /> 30 Tencate Mirafi 750 SY $ 5.00 $ (3,748.89) <br /> Sub-Total CREDIT PHASE II,Ill,IV $ (62,074.91) <br /> SUB TOTAL EAST OF NBR $ 169,431.21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.