My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> to the cost of labor described herein in accordance with the provisions of <br /> Paragraph 11.2B, herein, which surcharge shall constitute full <br /> compensation for payments imposed by state and federal laws and all <br /> other payments made to or on behalf of workers other than actual wages. <br /> 5. To the direct cost of equipment rental and labor, computed as provided <br /> herein, will be added the allowances for equipment rental and labor as <br /> provided in Paragraph 11.4, herein. <br /> 11.3 SPECIAL SERVICES <br /> A. Special Work or services are defined as that Work characterized by extraordinary <br /> complexity, sophistication, or innovation or a combination of the foregoing <br /> attributes which are unique to the construction industry. The following may be <br /> considered by the ENGINEER OF RECORD in making estimates for payment for <br /> special services: <br /> 1. When the ENGINEER OF RECORD and the CONTRACTOR, by <br /> agreement, determine that a special service or Work is required which <br /> cannot be performed by the forces of the CONTRACTOR or those of any <br /> of its subcontractors, the special service or Work may be performed by an <br /> entity especially skilled in the Work to be performed. After validation of <br /> invoices and determination of market values by the ENGINEER OF <br /> RECORD, invoices for special services or Work based upon the current <br /> fair market value thereof may be accepted without complete itemization of <br /> labor, material, and equipment rental costs. <br /> 2. When the CONTRACTOR is required to perform Work necessitating <br /> special fabrication or machining process in a fabrication or a machine <br /> shop facility away from the job site, the charges for that portion of the <br /> Work performed at the off-site facility may, by agreement, be accepted as <br /> a special service and accordingly, the invoices for the Work may be <br /> accepted without detailed itemization. <br /> 3. All invoices for special services will be adjusted by deducting all trade <br /> discounts offered or available, whether the discounts were taken or not. <br /> In lieu of the allowances for overhead and profit specified in Paragraph <br /> 11.4, herein, an allowance of five (5) percent will be added to invoices for <br /> special services. <br /> B. All Work performed hereunder shall be subject to all of the provisions of the <br /> Contract Documents and the CONTRACTOR's sureties shall be bound with <br /> reference thereto as under the original Agreement. Copies of all amendments to <br /> surety bonds or supplemental surety bonds shall be submitted to the OWNER for <br /> review prior to the performance of any Work hereunder. <br /> 11.4 CONTRACTOR'S OVERHEAD AND PROFIT <br /> A. Extra Work ordered on the basis of time and materials will be paid for at the <br /> actual necessary cost as determined by the ENGINEER OF RECORD, plus <br /> allowances for overhead and profit. For extra Work involving a combination of <br /> 00700-27/39 B <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.