My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.2 TITLE/OWNERSHIP TO MATERIALS FOUND ON THE WORK <br /> A. The OWNER reserves the right to retain title to all soils, stone, sand, gravel, and <br /> other materials developed and obtained from excavations and other operations <br /> connected with the Work until released by the OWNER. Any material desired to <br /> be retained by the OWNER shall be delivered by the CONTRACTOR to a <br /> designed area within a six (6) mile radius of the project, at no extra cost to the <br /> OWNER, as directed by the OWNER, unless otherwise specified in the Contract <br /> Documents. Neither the CONTRACTOR nor any subcontractor shall have any <br /> right, title, or interest in or to any such materials. The CONTRACTOR will be <br /> permitted to use in the Work, if approved by the OWNER and ENGINEER OF <br /> RECORD in writing, without charge, any such materials which meet the <br /> requirements of the Contract Documents. Once the OWNER releases ownership <br /> of the material, it shall become the property of the CONTRACTOR, who shall <br /> dispose of it in manner satisfactorily to the ENGINEER OF RECORD, as <br /> provided for by the CONTRACTOR, at no extra cost to the OWNER. <br /> 16.3 RIGHT TO AUDIT <br /> A. If the CONTRACTOR submits a claim to the OWNER for additional <br /> compensation, the OWNER shall have the right, as a condition to considering the <br /> claim, and as a basis for evaluation of the claim, and until the claim has been <br /> settled, to audit the CONTRACTOR's books to the extent they are relevant. This <br /> right shall include the right to examine books, records, documents, and other <br /> evidence and accounting procedures and practices, sufficient to discover and <br /> verify all direct and indirect costs of whatever nature claimed to have been <br /> incurred or anticipated to be incurred and for which the claim has been <br /> submitted. The right to audit shall include the right to inspect the <br /> CONTRACTOR's plants, or such parts thereof, as may be or have been engaged <br /> in the performance of the Work. The CONTRACTOR further agrees that the right <br /> to audit encompasses all subcontracts and is binding upon subcontractors. The <br /> rights to examine and inspect herein provided for shall be exercisable through <br /> such representatives as the OWNER deems desirable during the <br /> CONTRACTOR's normal business hours at the office of the CONTRACTOR. <br /> The CONTRACTOR shall make available to the OWNER for auditing, all relevant <br /> accounting records and documents, and other financial data, and upon request, <br /> shall submit true copies of requested records to the OWNER. <br /> - END OF SECTION - <br /> 00700-39/39 <br /> u <br />
The URL can be used to link to this page
Your browser does not support the video tag.