My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2527
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:44:08 PM
Creation date
3/2/2016 3:44:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2527
Date (mm/dd/yyyy)
02/18/2016
Description
4th Amd to Agmt w/Keith & Schnars: FPL Overhead to Underground Proj
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. SCOPE OF SERVICES <br /> Task 1 Engineering <br /> Subtask E.34 Pre-construction Services <br /> CONSULTANT shall provide limited pre-construction services to include: <br /> • Attend pre-construction meeting with selected Contractor as coordinated by CITY. <br /> • Provide technical review of Contractor's shop drawings and product data for conformance with <br /> approved construction documents. <br /> CONSULTANT's fee shall be based on a Time and Materials basis, Not to Exceed $5,000.00 <br /> Subtask E.35 Inspection Services <br /> CONSULTANT shall provide full time inspection services as the Engineer of Record to provide certification <br /> that the project is constructed in conformance with approved bid document. The project is expected to have a <br /> 13 month duration. It has been assumed that the CITY inspector will also be on site for 8 hours a day for <br /> inspection. Inspections by CITY will assist the CONSULTANT's daily efforts to the extent necessary for <br /> certification. <br /> Services are estimated at 8 hours per day, five days a week throughout an assumed construction period of <br /> only 13 months and include the following: <br /> • On-site observation of the work in progress to confirm construction in compliance with approved <br /> permit and plans. Report to CITY non-conforming issues which would impact certification. <br /> • Observe on-site testing as needed. <br /> CONSULTANT's fee shall be based on a Time and Materials basis, Not to Exceed $201,600.00 <br /> Subtask E.36 Construction Progress Meetings <br /> CONSULTANT shall conduct a weekly meeting with the contractor and CITY representative as the Engineer <br /> of Record to discuss construction progress, quality of various aspects of contractor's work, and discuss and <br /> resolve construction issues. For the proposed duration of the project, it has been anticipated that the <br /> construction duration for this project is 13 months. Accordingly,a total of 56 meetings will be scheduled. <br /> CONSULTANT's fee shall be based on a Time and Materials basis, Not to Exceed $39,600.00 <br /> Professional Services Agreement <br /> Project Name: Utility Undergrounding Consulting <br /> Project Location:Sunny Isles Beach,FL <br /> KEITH and SCHNARS, P.A. K&S Project 18073—Amendment No.7 <br /> '� ENGINEERS,PLANNERS, SURVEYORS January 19,2016(Revised)-Page 2 S 1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.