My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2538
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 2:56:32 PM
Creation date
3/21/2016 2:56:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2538
Date (mm/dd/yyyy)
03/17/2016
Description
Agmts w/FPL for Underground Conversions for 1st Construction Phase
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fifth Revised Sheet No.9.726 <br /> FLORIDA POWER&LIGHT COMPANY Cancels Fourth Revised Sheet No.9.726 <br /> (Continued from Sheet No.9.725) <br /> iv. When the aggregate size of the first 3 phases of a project would satisfy the minimum size criteria but, <br /> for mutually-agreed engineering or logistical-reasons, those phases are non-contiguous;provided that <br /> (a)the next (4th)phase must be adjacent to one or more of the first 3 phases such that the combined <br /> contiguous area meets the minimum size criteria, and (b) this 4th phase begins within 1 year from <br /> completion of the 3rd phase. <br /> 2. Contribution-in-Aid-of-Construction (CIAC). The Local Government Applicant shall pay FPL a CIAC as <br /> required by FPL's Electric Tariff and Section 25-6.115 of the Florida Administrative Code with the Otherwise <br /> Applicable CIAC amount reduced by the GAF Waiver. <br /> i. Otherwise Applicable CIAC 8_652,578 <br /> ii. GAF Waiver $_199,533 <br /> iii. CIAC Due $ 453,045 (Cust.Performs Some Work-C&C) <br /> In the event the actual cost of the Conversion exceeds the estimate, the Othenvise Applicable CIAC shall be <br /> adjusted by the lesser of(a)the difference between the actual cost of the Conversion and the estimate,or(b) 10% <br /> of the Otherwise Applicable CIAC identified above. The GAF Waiver shall also be adjusted accordingly and the <br /> Local Government Applicant shall pay FPL the resulting difference in the amount of the CIAC Due. <br /> 3. Applicant-Installed Facilities. The Local Government Applicant may, upon entering into an applicant- <br /> installed facilities agreement satisfactory to FPL, construct and install all or a portion of the Underground <br /> Facilities. Such work must meet FPL's construction standards and FPL will own and maintain the completed <br /> facilities. The Local Government Applicant agrees to rectify any deficiencies, found by FPL, prior to the <br /> connection of any customers to the Underground Facilities and the removal of the Existing Overhead Facilities. <br /> 4. Compliance with Tariff. The Local Government Applicant agrees to comply with and abide by the requirements, <br /> terms,and conditions of FPL's Electric Tariff. <br /> 5. Timing of Conversion. Upon compliance by the Local Government Applicant with the requirements,terms, and <br /> conditions of FPL's Electric Tariff, this Agreement and any other applicable agreements, FPL will proceed in a <br /> timely manner with the Conversion in accordance with the construction drawings and specifications set forth in <br /> Attachment A hereof. <br /> 6. Relocation. In the event that the Underground Facilities are part of,or are for the purposes of,relocation,then this <br /> Agreement shall be an addendum to the relocation agreement between FPL and the Local Government Applicant. <br /> In the event of any conflict between the relocation agreement and this Agreement or the Electric Tariff, this <br /> Agreement and the Electric Tariff shall control. <br /> 7. Term. This Agreement shall remain in effect for as long as FPL or any successor or assign owns or operates the <br /> Underground Facilities. <br /> 8. GAF Waiver Repayment. If the Local Government Applicant does not satisfy the relevant eligibility criteria,the <br /> Local Government Applicant shall repay the GAF Waiver within 30 days of written notice from FPL of such <br /> failure. Additionally, if at any point within 30 years of completion of the Underground Facilities installation,the <br /> Local Government Applicant elects to have electric service within the Conversion Area supplied by a provider <br /> other than FPL,the Local Government Applicant shall repay FPL a pro-rata share of the G AF Waiver. The pro- <br /> rata share(which shall reflect partial years)shall be determined as follows: <br /> GAF Waiver* [(30—years since the Underground Facilities completion date)/30] <br /> (Continued on Sheet No.9.727) <br /> Issued by: S.E.Romig,Director,Rates and Tariffs <br /> Effective: April 4,2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.