My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 16-04-01 172nd Drainage Repairs (Final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(16-04-01) 172 Street Drainage Repairs
>
ITB 16-04-01 172nd Drainage Repairs (Final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 11:25:16 AM
Creation date
4/6/2016 11:23:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 16-04-01 29 <br /> <br /> <br />BID FORM 3 <br />BID PRICING <br /> <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO <br />PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE <br />FOLLOWING LUMP SUM AND/OR UNIT PRICES. <br />BID <br />ITEM # DESCRIPTION UNIT EST. <br />QUANTITY <br />UNIT <br />COST <br />EXTENDED <br />COST <br />The lump sum (LS) prices for items 1-8 shall include but not be limited to temporary storage, removal and <br />proper disposal of existing ground coverings, asphalt pavement, sidewalks, curb & gutter, concrete pavement, <br />limerock and subgrade (where applicable) and/or all other organic material from the right-of-way as necessary <br />to perform the work stipulated. The lump sum price shall also include but not be limited to the removal, <br />protection and storage of existing signs, decorative stone, landscaping, and sprinkler systems existing within <br />the work zone. All items shall be restored as existing (such as existing pavers) or a better condition. <br />GENERAL <br />1. <br />Mobilization and Demobilization (Costs for pre- <br />and post- construction video surveys are to be <br />incorporated into this item.) (5%) <br />LS 1 $ $ <br />2. <br />Maintenance of Traffic (includes off duty police <br />support for the project duration) LS 1 $ <br />3. Clearing and Grubbing LS 1 $ $ <br />4. <br />NPDES Compliance – includes stormwater <br />pollution prevention plan (required) and NPDES <br />permitting and monitoring (where applicable) <br />LS 1 $ $ <br />5. Laboratory Testing LS 1 $ $ <br />6. <br />Removal and replacement of up to 100 SY of <br />existing Architectural pavers (includes sand <br />base) <br />LS 1 $ $ <br />7. Remove and reset existing fence LS 1 $ $
The URL can be used to link to this page
Your browser does not support the video tag.