Laserfiche WebLink
6 <br /> <br />Project Task: Describe project; include equipment to be used. <br />Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional <br />insured. <br /> <br />All equipment will be modified to include OSHA-compliant “white-noise” back-up alarms <br />to reduce construction site noise. <br /> <br />1. Utility upgrades and tie-ins under Collins Avenue, including: <br />a. Electrical service <br />b. Domestic water <br />c. Fire water <br />d. Sanitary <br />e. Storm water <br />f. Natural gas <br />g. Telephone/data/cable tv <br /> <br />All of which may require the following equipment: <br />a. Backhoes/Excavators <br />b. Loaders <br />c. Trucks (dump trucks, concrete trucks, equipment trucks, etc.) <br />d. Trailers <br />e. Compaction equipment <br />f. Sawcutting equipment <br />g. Paving machines <br />h. Directional boring equipment <br />i. Pumps (both for dewatering and concrete) <br />j. Street sweepers <br />k. Generators <br /> <br />2. Site preparation, grading, and excavation: <br />a. Backhoes/Excavators <br />b. Loaders <br />c. Bulldozers <br />d. Motor graders <br />e. Trucks (dump trucks, equipment trucks, etc.) <br />f. Dewatering pumps <br />g. Sand sifting equipment for beach sand relocation <br />h. Water trucks <br />i. Street sweepers <br />j. Generators <br /> <br />3. Augered Cast-in-Place Pile installation: <br />a. Cranes (crawler and hydraulic) <br />b. Drill rigs <br />c. Concrete trucks (for grout) <br />d. Grout pumps <br />e. Loaders