My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 16-Z-158
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2016
>
Zoning Resolution 16-Z-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:25:07 AM
Creation date
5/3/2016 2:10:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
16-Z-158
Date (mm/dd/yyyy)
04/21/2016
Description
La Playa Beach Assoc, Varadero Project, 18801 Collins Ave. (Hrg#Z2016-03)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />The number of trucks will vary greatly over the course of the project. During concrete <br />operations, we expect a minimum of fifty (50) deliveries in the course of a typical day. <br /> <br />The proposed truck route for the project will be as shown on the attached Traffic <br />Pattern to Enter/Exit Jobsite. Most trucks, except for the foundation mat concrete <br />trucks, will be staged on-site and not on Collins Avenue. The contractor will design <br />project trucks routes within the property to allow for truck staging within the site. <br /> <br />In addition, the contractor will have trained and certified flagmen (“gate attendants”) at <br />each gate that will ensure no trucks stage on Collins Avenue and will allow trucks to exit <br />the site with minimizing disruption to traffic. <br /> <br />As at Jade Signature, our contractor will hold training sessions with all subcontractors <br />and vendors to review the truck route and rules and regulations regarding truck <br />deliveries. For example, at Jade Signature, the contractor has inserted language into all <br />subcontracts and purchase orders requiring them to: <br />1. Fully comply with plans like this one, at all times <br />2. No delivery vehicles are allowed to make “u-turns” on Collins Avenue <br />3. No delivery vehicles are allowed to utilize side streets or commercial parking lots <br />to make “turn-arounds” <br />4. No delivery vehicles are allowed to block Collins Avenue for any reason <br /> <br />Material Storage Location: Describe the location for material storage (if needed). Any <br />removal or relocation of sand, must be approved separately. <br /> <br />It is our intention that some materials will be stored on-site, space permitting. Locations <br />will vary throughout the course of the activities; however, the materials will remain inside <br />the fenced construction site. <br /> <br />Specifically for sand, we would ideally like to stock the sand on-site, sift (if required by <br />FDEP) on-site, and place on the beach directly from our site. If this cannot occur due to <br />FDEP and City requirements, like at Jade Signature, we will rent land in west Miami- <br />Dade County, haul the excavated sand for storage at this land, sift the sand there, and <br />wait for further instructions on sand placement from the City and FDEP. <br /> <br />Construction Trailer: Will a construction trailer be used? If so, show location? <br /> <br />Construction trailers (for both managers and materials/equipment) will be required on- <br />site. Please see the proposed locations on-site, below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.