My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 16-Z-158
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2016
>
Zoning Resolution 16-Z-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:25:07 AM
Creation date
5/3/2016 2:10:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
16-Z-158
Date (mm/dd/yyyy)
04/21/2016
Description
La Playa Beach Assoc, Varadero Project, 18801 Collins Ave. (Hrg#Z2016-03)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> <br />We will require our contractor to prevent trucks and other equipment from blocking <br />traffic without the required MOT plan enactment. <br /> <br />Parking: Indicate the number of workers and the areas where their vehicles will be <br />parked through the duration of this phase of the project. <br /> <br />The number of workers will vary during the course of the project, but at the peak, we <br />expect approximately 225 individual workers. As the number of available parking spots <br />and vacant lots continues to decrease in and around Sunny Isles Beach, we will ensure <br />that workers carpool as much as possible. Further, we will secure parking at the <br />Haulover Beach parking lots and bus the workers from the parking location to the <br />construction site, then back to their vehicles at the end of their shift. <br /> <br />Clean-up: Describe the measures that will be taken to ensure that the work site and <br />public right-of-way will be maintained (including dust control, swale on driveways to <br />prevent water leaks to the street, gutter buddies, rocks at driveways, etc.) <br /> <br />Similar to Jade Signature, we will require the contractor to keep the construction site <br />safe and clean, including the immediate area outside the construction site to provide an <br />environment safe for walking pedestrians and personal vehicles. <br /> <br />Specific measures that will be taken to ensure a clean jobsite are: <br />1. Truck tire-wash areas at all project site exits prior to leaving the project. At Jade <br />Signature, the contractor developed steel grating to allow all tire surfaces to be <br />cleaned with the mud/dirt falling into the gaps in the grating, preventing this <br />mud/dirt from flowing into the street (see photo, below). The tires will be cleaned <br />using pressure washers to ensure full removal of mud/dirt/concrete. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.