My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 16-Z-158
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2016
>
Zoning Resolution 16-Z-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:25:07 AM
Creation date
5/3/2016 2:10:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
16-Z-158
Date (mm/dd/yyyy)
04/21/2016
Description
La Playa Beach Assoc, Varadero Project, 18801 Collins Ave. (Hrg#Z2016-03)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Varadero <br />Traffic Study <br /> <br />Page 25 <br />The processing rate was calculated by adding the time it will take a valet attendant to process the <br />vehicles (processing time), the time it will take him to drive to the parking space (driving time) <br />the time it will take him to maneuver stacked vehicles and mechanical lift in order to park or <br />retrieve a vehicle (mechanical lift time and park processing time), and the time it will take him to <br />walk to/from the parking area (walking time). A processing time of 51 seconds per vehicle was <br />used in the analysis. This information is based on data collected on a hotel in Miami Beach (see <br />Appendix G). The driving time for the valet attendant was calculated on a conservative speed of <br />10 mph, and the walking time for the valet attendant was calculated on a jogging speed of 6ft/sec. <br />The mechanical lift time has a process time of 30 seconds per platform lift. This timing was <br />tripled to assume that every vehicle would need to wait for the lift to come from the most <br />suspended position in order to load. The calculations for the Station 1 are presented in Exhibit 14. <br /> <br />Exhibit 14 <br />Station 1- Residential Lobby <br />Valet Processing Rate <br /> <br />Inbound Valet Time <br />Processing time: 51 sec / 60 sec / 1 min = 0.85 min <br />Driving time (most distant space): 1068 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.21 min <br />Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min <br />Park Processing Time: 0.50 min <br />Walking time: 487ft/6 ft/sec / 60 sec/min = 1.35 min <br />Total = 5.41 min <br /> <br />Outbound Valet Time <br />Processing time: 51 sec / 60 sec / 1 min = 0.85 min <br />Driving time (most distant space): 1121 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.27 min <br />Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min <br />Park Processing Time: 0.75 min <br />Walking time: 487ft/6 ft/sec / 60 sec/min = 1.35 min <br />Total = 5.72 min <br />
The URL can be used to link to this page
Your browser does not support the video tag.