|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />George Puig, PLA
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Project Manager / Landscape Architecture /
<br />Site Master Planning / Urban Design / Active
<br />and Passive Park Design / Streetscape
<br />Planning and Design
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 25
<br />b. WITH CURRENT FIRM
<br /> 3.5
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Kimley-Horn and Associates, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Landscape Architecture / Landscape Architecture
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />FL / Prof Landscape Architect
<br />PR / Prof Landscape Architect
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Urban Land Institute, Colegio de Arquitectos y Arquitectos Paisajistas de Puerto Rico (CAAPPR)
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Heritage Park and Parking Garage, Sunny Isles Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (If Applicable)
<br />2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Served as project manager and senior landscape architect responsible for the landscape, hardscape, site furniture, site lighting,
<br />and site planning design from concept through construction administration of a four-acre urban park and six-level, 500-space
<br />parking garage within an urban coastal site. Key elements included an interactive water feature, performance stage, multi-use
<br />event lawn, amphitheater seating, memorial wall and plaza, playgrounds, and exercise paths.
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Pelican Community Park and Community Center, Sunny
<br />Isles Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2002
<br />CONSTRUCTION (If Applicable)
<br />2004
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Served as project manager/ landscape architect responsible for the design and coordination of a 2.5 acre active park project
<br />that provided a two-story recreation building, gymnasium, little league baseball field, and playground, and related site
<br />amenities. Prepared conceptual plans through construction documents and coordinated with in-house disciplines as well as
<br />sub-consultants.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Collins Avenue Beautification, City of Sunny Isles Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (If Applicable)
<br />2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Served as project manager for a City of Sunny Isles Beach Heritage Park project adjacent to Collins Avenue (SR A1A). The
<br />beautification improvements to Collins Avenue included paver sidewalks, street trees, and street furniture that met the aesthetic
<br />standards of the City, and required coordination with FDOT staff during the design and permitting stages of the project.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miami General Landscape Architectural Services Contract,
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Currently serving as project manager for the Kimley-Horn team that is providing the City of Miami with landscape architecture
<br />services at various project sites throughout the City. Services include the design of landscape architectural components
<br />including hardscape, landscape, site furniture, site lighting and irrigation for different project types including parks, streetscapes,
<br />and other related urban public realm areas from concept through construction.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />General Landscape Architectural Services Contract, Village of
<br />Palmetto Bay, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Currently serving as project manager for the Kimley-Horn team that is providing the Village of Palmetto Bay with landscape
<br />architecture services, including the design of landscape architectural components including hardscape, landscape, site
<br />furniture, site lighting and irrigation for different project types including parks, streetscapes, and other related urban public realm
<br />areas from concept through construction.
<br />
<br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2
|