My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
Chen-Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:19:17 AM
Creation date
5/18/2016 11:16:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architect
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landscape Architect Services RFQ No. 16-04-02 4-5 <br />Ba <br />c <br />k <br />g <br />r <br />o <br />u <br />n <br />d <br /> <br />a <br />n <br />d <br /> <br />O <br />r <br />g <br />a <br />n <br />i <br />z <br />a <br />t <br />i <br />o <br />n <br />a <br />l <br /> <br />St <br />r <br />u <br />c <br />t <br />u <br />r <br />e <br />Construction Administration Services <br />At Chen Moore and Associates, the engineers work very closely with the in-house inspectors, allowing a <br />diff erent point of view when interpreting construction documents. Considerable experience has been gained <br />due to the fact that all engineers involved in infrastructure design have had fi eld experience performing <br />construction management services. The lessons learned in the fi eld are incorporated into design, and the <br />engineers have the knowledge to make educated decisions about the acceptability of the work. <br />The Chen team realizes that even with the best planning, pre-investigation, design and communication, <br />changes can occur during construction. The <br />most eff ective way of dealing with change <br />orders is to try to anticipate them, quickly <br />provide alternative solutions that are <br />acceptable to both the Client and Contractor, <br />and negotiate with both entities to minimize <br />additional costs. Often times, changes can be <br />made on site without the need for the change <br />order process. Chen Moore and Associates <br />has built a reputation of administering <br />projects in a way which minimizes change <br />orders and the costs associated with them. <br />The following are services CMA commonly <br />performs during construction: <br />• Bidding Assistance <br />• Preconstruction Services <br />• Value Engineering <br />• Scheduling <br />• GIS/GPS Report Integration <br />• Administration <br />• Testing <br />• Construction Monitoring <br />• Construction Engineering Inspections <br />• Construction Management <br />• Bond Releases
The URL can be used to link to this page
Your browser does not support the video tag.