Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Marcus Austin, GC, LEED AP <br />13. ROLE IN THIS CONTRACT <br /> CEI <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 28 <br />b. WITH CURRENT FIRM <br /> 14 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Fort Lauderdale, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Associate of Science / Civil / Architectural Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL / General Contractor's License <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Marcus has been Senior Construction Services Manager for Neighborhood Improvement Projects in Broward County for 12 years. <br />Along with supervising $35 million in construction, he has acted as client liaison, performed contractor negotiations, inspections and <br />construction start up for major and minor lift stations in Pompano Beach and streetscaping projects in Dania Beach and City o f <br />Margate. He is experienced with large transmission mains, both water and wastewater. Through experience working with the Town <br />of Hypoluxo and City of Riviera Beach, he is familiar with local regulatory agencies and City standards. Marcus routinely per forms <br />constructability review of CMA design plans and is excellent at finding opportunities for value engineering. He currently holds a <br />Water Distribution Level 2 certification. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Downtown Coral Springs Streetscaping <br />Coral Springs, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Construction Services. CMA was contracted by the City of Coral Springs to assist the Coral Springs CRA in the <br />planning, design, permitting and construction support of various streetscaping improvements in Downtown Coral Springs. As <br />the prime consultants, CMA provided civil engineering, landscape architecture, environmental permitting and construction <br />engineering and inspection services for the project. The project included implementing Complete Street concepts for NW 31st <br />Court, NW 94th Avenue and NW 32nd Street. Cost $ 4,100,000.00 Fee $ 235,739.98 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Westside Park Baseball Field <br />Deerfield Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Construction Services. CMA provided design, permitting and construction engineering inspection services for the <br />conversion of an existing football field and multi-purpose field into one Babe Ruth Baseball field, one Little League Baseball <br />field, and one practice baseball field for the City of Deerfield Beach Parks and Recreation Department. CMA was responsible <br />for providing survey, geotechnical, site planning, civil engineering, landscape architecture, MEP and structural engineering <br />services. The scope of the project included the layout of the baseball fields with supporting services such as lighting, dugouts, <br />scoreboards and irrigation. The project also included general improvements to the park around the baseball fields including <br />better pedestrian access, ADA parking and sidewalk improvements, native landscaping, outdoor seating areas and stormwater <br />improvements. Cost $ 1,600,000.00 Fee $ 72,865.00 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City Center Right-of-Way and Utility Improvement Project <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Construction Services. CMA is under contract with the City of Miami Beach to perform planning, design and <br />construction administration services for the infrastructure redevelopment within public right -of-way areas of the City <br />Centerneighborhood in downtown Miami Beach. The project scope included stormwater drainage, sanitary force main, and <br />8,700 LF of 8-inch water main infrastructure improvements, along with streetscaping, landscaping, and lighting upgrades. Cost <br />$ 21,200,000 Fee $ 3,611,340.00 <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Gardens YMCA/FC Barcelona Soccer Field <br />Miami Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Construction Services. CMA worked with Borrelli Architects to design the demolition, earthwork, paving, grading, <br />drainage, landscape architecture and irrigation plans for a park master plan that included professional level soccer field, a <br />baseball field and a multi-purpose field (flag football and soccer) within the existing property adjacent to the existing YMCA <br />Miami Gardens facility located in Miami Gardens. The scope included final design for the professional level soccer field <br />including the earthwork and mainline drainage noted above. Services include government permitting with PERA (formerly <br />DERM) and Miami Gardens, bidding assistance, construction observation and closeout services. Cost $ 500,000.00 Fee $ <br />23,000.00 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Aviation Blvd Roadway & Hardscape Improvements <br />Marathon, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On - Going <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Construction Services. CMA will assist in the preparation of roadway and hardscape plans. The project considers the <br />shift of the existing roadway centerline to accommodate a shared 8’ shared path that includes specialty lighting, hardscape <br />elements including benches, pavers and landscaping at various areas along the road. Traffic calming elements including speed <br />humps are being implemented. The project also includes geometric modifications to the roadway along with considerations for <br />existing utilities and stormwater. Fee $ 113,500.00 <br /> STANDARD FORM 330 (6/2004) PAGE 2