My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
Chen-Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:19:17 AM
Creation date
5/18/2016 11:16:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architect
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)16. EDUCATION (DEGREE AND SPECIALIZATION) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Jayson Hall <br />Project Manager <br />10 10 <br />CPZ Architects, Inc. Plantation, Florida <br />Florida Atlantic University-5-year Bachelor of <br />Architecture <br />N/A <br />National Council Architectural Registration <br />Sunrise Chamber of Commerce <br />Coral Springs Public Safety Complex <br />Coral Springs, Florida 2006 2010 <br />Project involved complete reconfiguration of the complex’s 7-acre site to expand parking <br />space and provide new site security and emergency generator system. New facilities also <br />include a 9,800 square foot LEED Certified Gold Fire Station. <br />Cost: $8 million. Completed: February 2010 <br />x <br />Miami Gardens Amphitheater <br />City of Miami Gardens 2011 2011 <br />Owner retained CPZ Architects to design a 300 seat Amphitheater. Amphitheater facility <br />is 2,500 square feet and seats 300 people on the retaining wall seating system with <br />additional lawn seating. <br />Cost: $700,000. Completed: 2011 <br />x <br />Miramar Amphitheater <br />City of Miramar, Florida 2013 <br />A new Miramar Cultural Amphitheater Complex with a 1500 non-permannt seat amphitheater <br />and lawn seating areas for a capacity of 2,500. Site also consists of a <br />concession/restroom building and a ticket booth. <br />Cost: $ 4 million <br />x <br />Miami Gardens Community Center <br />City of Miami Gardens 2008 2010 <br />Owner retained CPZ Architects to replace the original Architect at start of project <br />construction fo this 60,000 SF complex. Project was successfully put back on track, <br />meeting the City's goal for completion. <br />Cost: $ 12 million Completed: 2010 <br />x <br />Pompano Beach Lift Station #21 Pompano Beach, FL <br />2009 2015 <br />CPZ Architects worked with Chen Moore and Associates to design a new Master Pump Station <br />serving the majority of the City’s Barrier Island. The building aesthetics was to <br />conform to the new Pompano Beach Beautification Redevelopment Plan. <br />Cost $3.3 million Completed: 2015 <br />x
The URL can be used to link to this page
Your browser does not support the video tag.