Laserfiche WebLink
LAND DESIGN SERVICES DIVISION <br />LANDSCAPE ARCHITECTURE // PLANNING // ENVIRONMENTAL // TRANSPORTATION // ENGINEERING // SURVEY <br />SUBSURFACE UTILITY ENGINEERING // STRUCTURES // WATER RESOURCES // CREATIVE SERVICES <br />WGI’s Land Design Services Division has had the <br />Continuing Services Contract for Capital Improvement <br />Projects with the City of Miramar since 2008. Recent <br />projects include Country Lakes Park and traffic analyses <br />for the Miramar City Center. <br />Country Lakes Park consists of 2 parks in western <br />Miramar that are adjacent to Everglades High and <br />Glades Middle School. The recreational design focused <br />around providing an open multi-purpose green space <br />with parking for the adjacent baseball fields on school <br />grounds. The first park provides a soccer field, 3 <br />basketball courts, playgrounds, pavilions and a one <br />mile biking/walking trail, while the second park is a <br />combination of a dog park and a nature preserve with a <br />1.5 mile nature trail. Scope of services also included the <br />design phase for both parks. <br />WGI also holds a continuing services contract with the <br />city of miramar for DRC review which includes land <br />planning, landscape architecture, traffic and engineering <br />with the City of Miramar. <br />COUNTRY LAKES PARK <br />CONTINUING SERVICES FOR CAPITAL IMPROVEMENTS, CITY OF MIRAMAR <br />LOCATION: <br />Miramar, Florida <br />REFERENCE: <br />City of Miramar <br />Mr. Alex Shershevsky <br />2300 Civic Center Place <br />Miramar, Florida 33025 <br />Phone: 954.602.3315 <br />DATE STARTED: <br />Design September 2010 <br />Construction N/A <br />DATE COMPLETED: <br />Design August 2011 <br />Construction N/A <br />TOTAL COST: <br />Design $15K <br />Construction N/A <br />PROJECT MANAGER: <br />Doug Murray, RLA <br />KEY STAFF: <br />Brian Terry, RLA, LEED AP <br />PAGE 10