Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Cheryl Callender, RLA, LEED <br />13.ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />15 <br />b.WITH CURRENT FIRM <br /> 1 <br />15.FIRM NAME AND LOCATION (City and State) <br />Wantman Group, Inc., Ft. Lauderdale, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Master of Landscape Architecture – Florida A & M University, 2006 <br />B.S, Architecture - University of Panama, 1997 <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Registered Landscape Architect <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />LEED Green Associate, American Society of Landscape Architects, US Green Building Council <br />Cheryl is a trilingual (English, Spanish, and French) professional designer and project manager with over 16 years of experience. Her <br />experience includes designing and managing the construction of multiple high profile urban projects in Panama, as well as designing <br />numerous streetscapes, private and municipal projects, and large-scale roadway beautification and gateway projects in Florida. Cheryl <br />provides her expertise in all aspects and stages of the design process, production and construction, focusing on implementing green <br />practices and techniques. In addition, Cheryl aids with the quality assurance and quality control of deliverables. <br />19. RELEVANT PROJECTS [Relevant Projects:] <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />Little Haiti Park Improvements <br />Miami Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />2016 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect. Cheryl was responsible for the design, construction documents, warrant process and permit applications, <br />and coordination for the improvements to this park. The project consisted of renovating an existing natural grass soccer <br />practice field into a synthetic turf multi-use practice field, and the re-alignment of the surrounding walking path to minimize <br />impacts to the existing vegetation. In addition to the associated amenities which included: a grouped exercise equipment station <br />package with a shade structure, a metal prefab storage building with a chilled drinking fountain, and the modifications to the <br />existing irrigation system and mitigation for the existing trees impacted by the new synthetic turf field area. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Simpson Park Pedestrian East Entrance <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect. Cheryl was responsible for the Concept design and presentation graphics for the renovation of the East <br />access to this historic park in the downtown center of Miami. The project consisted of preparing a conceptual plan for the East <br />entrance of the park, including a Gate feature, hardscape treatment, landscape lighting, and park furniture, in addition to <br />modifications to the existing irrigation system and landscape plant material. . <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />A1A Restoration and Streetscape <br />Ft. Lauderdale Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect of Record. Cheryl was responsible for the design of the streetscape, the sidewalk and crosswalks <br />hardscape, the wave seawall, beach access entrance features, beach shower pads areas, irrigation, and landscape/planting <br />areas. As well as the coordination with the City of Fort Lauderdale, and FDOT’s in-house roadway designers. The project <br />improvements comprised the repair and restoration of the existing seawall and sidewalk damaged by Hurricane Sandy. It <br />incorporated roadway realignment, adding bike lanes and on street parking, hardscape treatments, ADA upgrades, landscape, <br />decorative lighting, signage and improved storm water drainage. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Atlantic Boulevard Streetscape CRA <br />Pompano Beach, Florida <br />(2)YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If Applicable) <br />2011 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Designer. Cheryl was responsible for the streetscape design, landscape inventories, landscape and irrigation <br />design, decorative lighting, significant public meetings and graphic presentations, as well as the coordination with other <br />professional teams preparing designs on adjacent projects for the City of Pompano Beach CRA. This project is a significant <br />streetscape beautification improvement to an existing mile of urban mixed use street serving as the main roadway corridor from <br />US-1 to the Pompano Beach beachfront. It also included ADA upgrades, signage and improved storm water drainage <br /> STANDARD FORM 330 <br />PAGE 25