E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Cheryl Callender, RLA, LEED
<br />13.ROLE IN THIS CONTRACT
<br />Project Manager
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />15
<br />b.WITH CURRENT FIRM
<br /> 1
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Wantman Group, Inc., Ft. Lauderdale, Florida
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Master of Landscape Architecture – Florida A & M University, 2006
<br />B.S, Architecture - University of Panama, 1997
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida, Registered Landscape Architect
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />LEED Green Associate, American Society of Landscape Architects, US Green Building Council
<br />Cheryl is a trilingual (English, Spanish, and French) professional designer and project manager with over 16 years of experience. Her
<br />experience includes designing and managing the construction of multiple high profile urban projects in Panama, as well as designing
<br />numerous streetscapes, private and municipal projects, and large-scale roadway beautification and gateway projects in Florida. Cheryl
<br />provides her expertise in all aspects and stages of the design process, production and construction, focusing on implementing green
<br />practices and techniques. In addition, Cheryl aids with the quality assurance and quality control of deliverables.
<br />19. RELEVANT PROJECTS [Relevant Projects:]
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Little Haiti Park Improvements
<br />Miami Dade County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />2016
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Landscape Architect. Cheryl was responsible for the design, construction documents, warrant process and permit applications,
<br />and coordination for the improvements to this park. The project consisted of renovating an existing natural grass soccer
<br />practice field into a synthetic turf multi-use practice field, and the re-alignment of the surrounding walking path to minimize
<br />impacts to the existing vegetation. In addition to the associated amenities which included: a grouped exercise equipment station
<br />package with a shade structure, a metal prefab storage building with a chilled drinking fountain, and the modifications to the
<br />existing irrigation system and mitigation for the existing trees impacted by the new synthetic turf field area.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />Simpson Park Pedestrian East Entrance
<br />Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Landscape Architect. Cheryl was responsible for the Concept design and presentation graphics for the renovation of the East
<br />access to this historic park in the downtown center of Miami. The project consisted of preparing a conceptual plan for the East
<br />entrance of the park, including a Gate feature, hardscape treatment, landscape lighting, and park furniture, in addition to
<br />modifications to the existing irrigation system and landscape plant material. .
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />A1A Restoration and Streetscape
<br />Ft. Lauderdale Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Landscape Architect of Record. Cheryl was responsible for the design of the streetscape, the sidewalk and crosswalks
<br />hardscape, the wave seawall, beach access entrance features, beach shower pads areas, irrigation, and landscape/planting
<br />areas. As well as the coordination with the City of Fort Lauderdale, and FDOT’s in-house roadway designers. The project
<br />improvements comprised the repair and restoration of the existing seawall and sidewalk damaged by Hurricane Sandy. It
<br />incorporated roadway realignment, adding bike lanes and on street parking, hardscape treatments, ADA upgrades, landscape,
<br />decorative lighting, signage and improved storm water drainage.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />Atlantic Boulevard Streetscape CRA
<br />Pompano Beach, Florida
<br />(2)YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If Applicable)
<br />2011
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Landscape Designer. Cheryl was responsible for the streetscape design, landscape inventories, landscape and irrigation
<br />design, decorative lighting, significant public meetings and graphic presentations, as well as the coordination with other
<br />professional teams preparing designs on adjacent projects for the City of Pompano Beach CRA. This project is a significant
<br />streetscape beautification improvement to an existing mile of urban mixed use street serving as the main roadway corridor from
<br />US-1 to the Pompano Beach beachfront. It also included ADA upgrades, signage and improved storm water drainage