|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Bryan Donahue, RLA
<br />13.ROLE IN THIS CONTRACT
<br />Landscape Architecture
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />8
<br />b.WITH CURRENT FIRM
<br /> 1
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Wantman Group, Inc., West Palm Beach, Florida
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Architecture, Landscape Architecture, University of
<br />Georgia
<br />
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida, Registered Landscape Architect
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Landscape Architects
<br />Bryan has over eight years of experience and oversees a team of designers on various projects, from country clubs and
<br />commercial developments to residential communities and single-family residential homes. Bryan works with the client from a
<br />project’s inception to fully understand their vision. He and his team then work through a detailed design process to produce final
<br />landscape, hardscape, irrigation and lighting construction documents.
<br />19. RELEVANT PROJECTS [Relevant Projects:]
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Society of the Four Arts
<br />Palm Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Project Manager. Bryan oversaw all aspects of the project and client relationships. The Society of the Four Arts located on
<br />Palm Beach Island offers a unique and quality cultural programming to the growing resort community of Palm Beach. The
<br />campus is home to beautiful sculpture and botanical gardens, a library and children’s library, and a state-of-the art educational
<br />facility. Each season, The Four Arts offers a dynamic lineup of cultural programing, including notable speakers, concerts, films,
<br />educational programs, and art exhibitions. During the peak season there is a shortage of parking to support the patrons
<br />attending the programs. WGI worked closely Conkling and Lewis Construction and the client to develop an innovative solution
<br />to help alleviate the parking issues. The solution developed entailed modifications to the site to implement a stabilized sod
<br />parking area on the existing green mall area in the center of the campus, utilized for valet purposes only during peak season.
<br />This innovative solution alleviates the parking issues while maintaining the beauty of the existing mall space. WGI provided site
<br />planning, civil engineering and landscape architecture. WGI prepared plans and provided support throughout the approval and
<br />construction process.
<br />
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />Abacoa Town Center
<br />Jupiter, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Project Manager. The Abacoa Town Center was developed approximately 15 years ago as the central commercial district to
<br />support the overall Abacoa development. Over the years the Town Center has lost many of its tenants and has lost the life that
<br />once filled the center. WGI was hired to develop an overall master plan and detailed concept plans for key areas throughout
<br />the Town Center to help with the revitalization efforts. The overall design goal was to create a state of the art destination for
<br />Abacoa communities and surrounding neighborhoods to experience local art, culture, music, fun and games in a safe,
<br />educational and family friendly interactive environment which will reinvigorate life into the town center. The design process
<br />began with client meetings and extensive research into successful downtown and town center developments. Ideas were
<br />generated and the overall program was developed. The program was then refined into one overall master plan and several
<br />detailed concept plans and renderings to convey the intent of the program and design. The final designs were incorporated into
<br />an overall presentation. Now that this phase of the project is complete, the next step is developing the concepts into
<br />construction documents and moving into the construction phase of the project.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Waterway Park Continuing Services – Palm Beach County Parks
<br />and Recreation
<br />West Palm Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Project Manager. Bryan is responsible for oversight and development of landscape plans for the project. This 30-acre park is
<br />located on the west side of the Intracoastal Waterway in Jupiter. The park features include boat ramps, boardwalk and trail
<br />systems, parking, picnic pavilions, and other associated facilities. Services included the master plan, development approvals,
<br />environmental site assessment, upland/wetland assessment, wetland delineation, gopher tortoise survey, and a tree survey.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />Woodfield Country Club
<br />Boca Raton, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Landscape Architect. Bryan was responsible for preparation of all landscape architecture components associated with
<br />development of this neighborhood “pocket” park. Goldenrod Park features a half-court basketball court, a play structure with a
<br />rock climbing wall, multiple slides, interactive play stations and a pavilion shade structure with a picnic table. Services provided
<br />to the village included preparation of landscape plans and irrigation plans.
<br />STANDARD FORM 330
<br />PAGE 30
|