My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WGI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
WGI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:44:06 AM
Creation date
5/18/2016 11:41:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architect
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />2 <br />21.TITLE AND LOCATION (City and State) <br />Windmill Point Community Park <br />Port St. Lucie, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (if Applicable) <br />N/A <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />City of Port St. Lucie Parks and <br />Recreation Department <br />b.POINT OF CONTACT NAME <br />Larry Lankow <br />c.POINT OF CONTACT TELEPHONE NUMBER <br />772.878.2277 <br />24.BRIEF DESCRIPTION OF PROJECT AND <br />RELEVANCE TO THIS CONTRACT (Include scope, size, <br />and cost) <br />WGI’s Land Design Services Division <br />was contracted with the City of Port <br />St. Lucie to develop a full master plan <br />for a community sports park located in <br />the City. The overall design of the 32- <br />acre complex included soccer, <br />baseball, softball, tennis, and <br />concession stands as well as <br />retention ponds and parking. <br />The charrette portion of the project <br />was held over three days. The presentation involved a team of Landscape Architects from WGI and the City <br />representatives from the City Council, Planning and Zoning, Public Works, and Parks and Recreation. The <br />public was invited as well. The design charrette was very successful in determining the location and the size <br />of the recreation complex based upon the needs of the City. <br />WGI represented the final design before the Planning and Zoning division. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT [Section C Firms:] <br />a. <br />(1)FIRM NAME <br />Wantman Group, Inc. <br />(2)FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3)ROLE <br />Prime Consultant <br />b. <br />(1)FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE <br />STANDARD FORM 330 <br />PAGE 40
The URL can be used to link to this page
Your browser does not support the video tag.