My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:51:47 AM
Creation date
5/18/2016 11:49:15 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architecture
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />9 <br />21. TITLE AND LOCATION (City and State) <br />MIDDLE BEACH RECREATIONAL <br />CORRIDOR <br />Miami Beach, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Landscape Architecture <br />Electrical Engineering, Civil <br />Engineering, Environmental <br />Permitting, Construction <br />Administration <br />CONSTRUCTION <br />(If applicable) <br /> <br />2012-2014 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Delray Beach CRA <br />b. POINT OF CONTACT NAME <br />Elizabeth Wheaton <br />Environmental Manager <br />c. POINT OF CONTACT TELEPHONE <br /> NUMBER <br />(305) 673-6070 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Calvin, Giordano & Associates, Inc. was contracted by the City of Miami Beach to design and permit an on-grade, ADA-accessible pathway that will support the use of bicycles, Walking, and other non-motorized means of transportation. The MDRC project is a part of the greater Atlantic Greenway Network, which is a system of bicycle facilities throughout the City of Miami Beach. The MDRC will connect to the existing Miami Beach Boardwalk at Indian Beach Park on the south and the North Beach Recreational Trail at Allison Park on the north with a 2-mile paver walkway, continuing the City’s unique branding qualities. The path will be permitted in accordance with the Florida Dept. of Environmental Protection’s and the Florida Fish and Wildlife Conservation Commission’s regulations, as the entirety of the project lies within Stat-owned lands. The scope of work includes extensive public outreach, branding and site design, coastal engineering, dune planting plans, lighting design, and bidding and construction administration. The project will connect business districts, cultural/tourism centers, parks, residential neighborhoods and the beaches. The MBRC will complete a major portion of the essential north-south connector of the AGN and further facilitate pedestrian and non-motorized transportation throughout the City. Design and permitting are anticipated to be completed in Summer, 2015, with construction promptly beginning soon after. Construction Cost $13 Million Firm’s Fee $534,000. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Calvin, Giordano & Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />Fort Lauderdale, FL <br />(3) ROLE <br />Prime <br />b. <br /> <br /> <br /> <br /> <br /> <br /> <br />c. <br />d. <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) <br />MANDATORY USE DATE OF FORM 6/2004
The URL can be used to link to this page
Your browser does not support the video tag.