My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2553
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 4:43:57 PM
Creation date
5/27/2016 4:43:51 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2553
Date (mm/dd/yyyy)
05/19/2016
Description
1st Amd to Agmt w/Safeware , Security at Gateway Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
safeware <br /> SAFETY•S ERV I C E•RESPO N S E <br /> Cabling Infrastructure: <br /> Nor- <br /> The Safeware Team will run multiple copper conductors to address all door device <br /> requirements for each device located at the door. All cabling will be run inside the electrical <br /> contractor provided conduit (not in this proposal)and terminated in the IDF Closet located in - <br /> the first floor of Gateway Park. Connection to City Network will take place through the KT400 IP <br /> connection and interconnect to others will be through RS485 connection. <br /> Electronic Locking Mechanism(25): <br /> All Double Door and Single Doors will be armed through a magnetic Locking mechanism that <br /> will be surface mounted at the corner of a single door and on the center for double doors.All <br /> (15)at Gateway Park will be equipped with this type of locking mechanism. Access control will <br /> be tied into the fire alarm system for lock release in case of fire emergency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.