Laserfiche WebLink
safeware <br /> SAFETY•S ERV I C E•RESPO N S E <br /> Cabling Infrastructure: <br /> Nor- <br /> The Safeware Team will run multiple copper conductors to address all door device <br /> requirements for each device located at the door. All cabling will be run inside the electrical <br /> contractor provided conduit (not in this proposal)and terminated in the IDF Closet located in - <br /> the first floor of Gateway Park. Connection to City Network will take place through the KT400 IP <br /> connection and interconnect to others will be through RS485 connection. <br /> Electronic Locking Mechanism(25): <br /> All Double Door and Single Doors will be armed through a magnetic Locking mechanism that <br /> will be surface mounted at the corner of a single door and on the center for double doors.All <br /> (15)at Gateway Park will be equipped with this type of locking mechanism. Access control will <br /> be tied into the fire alarm system for lock release in case of fire emergency. <br />