My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2553
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 4:43:57 PM
Creation date
5/27/2016 4:43:51 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2553
Date (mm/dd/yyyy)
05/19/2016
Description
1st Amd to Agmt w/Safeware , Security at Gateway Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safeware <br /> SAFETY•SERVICE.RESPONSE <br /> 24TS <br /> SPF GBIC MODULE for field switch req.for EA CISCO GBIC 2 2 <br /> multi mode <br /> NEMA ENCLOSURE PACKAGE(Includes: All EA Custom Custom 2 2 <br /> necessary Mounting Brackets) <br /> Electrical requirements for Airfiber Link EA Custom Custom 1 1 <br /> CABLE INFRASTRUCTURE EA Custom Custom 1 1 <br /> The The <br /> LABOR REQUIREMENTS-INSTALLATION,TRIM HR Safeware Safewar 800 800 <br /> OUT,PROGRAMMING-Z01 Team e Team <br /> The The <br /> EA Safeware Safewar 25 25 <br /> AS BUILTS DRAWINGS AND ENGINEERING-Z01 Team e Team <br /> The The <br /> EA Safeware Safewar 85 85 <br /> PROJECT MANAGEMENT-201 Team e Team <br /> The The <br /> MISCELLANEOUS COST-CONNECTORS,Boxes- EA Safeware Safewar 1 1 <br /> _ Z01 _ Team a Team _ <br /> l <br /> TOTAL COST OF PROJECT $112,719.13 <br /> INCLUDING SAFEWARE PRICING <br /> • <br /> B <br />
The URL can be used to link to this page
Your browser does not support the video tag.