Laserfiche WebLink
V M"fic....„, Sdewtvr# <br /> SAFETY•SERVICE•RESPONSE <br /> Category 6 Cabling for Offices: <br /> A <br /> atk, <br /> • <br /> Teto <br /> a. \ <br /> \1\ <br /> r <br /> i r 4q Q O $y <br /> r$j \. <br /> The Safeware Team will supply and install all structured cabling for office space per the drop <br /> locations provided.The cabling infrastructure will be run through conduit system provided by <br /> onsite electrician. All cabling will be terminated into a rack mounted patch panel located inside <br /> the MDF location within Gateway Park.A total of(36)drops will be provided. All drops will be <br /> terminated into 4 port faceplate at the locations denoted on the city provided plans. <br /> CI' <br />