My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2553
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 4:43:57 PM
Creation date
5/27/2016 4:43:51 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2553
Date (mm/dd/yyyy)
05/19/2016
Description
1st Amd to Agmt w/Safeware , Security at Gateway Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SafewarE <br /> SAFETY•SERVICE•RESPONSE <br /> TOTAL COST OF PROJECT INCLUDING $59,052.20 <br /> SAFEWARE PRICING <br /> Conduit Infrastructure-Only from Riser Junction Box to Code Blue Station - EA M ATCI ATCI I 1 1 , <br /> TOTAL COST OF PROJECT INCLUDING SAFEWARE PRICING $3,192.00 <br /> Please Note: <br /> The Safeware Team will coordinate with all required trades relating to the scope of work and code compliance. <br /> All conduit to the top of the door frames by electrician per site walkthrough. Door conduit prep to device by Safeware Team if <br /> Conduit options are approved. <br /> Doors and Handles/Panic shall be installed by cothers. <br /> All low voltage cabling and trim out of all devices including electric locks by Safeware Team for doors based on Mag Locks to the <br /> doors. <br /> a <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.